EVENT LOG FOR SITE RPJ The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 05/02/2007 12:31 bturley@ 02:TestTagFailure,07:LowLithium,07:TestTagFailure: test tag failures and low lithium acknowledged 04/27/2007 16:28 Dave I disabled checking for data submissions in etc/sites. 04/27/2007 13:35 Dave Brett Turley (Biomark) reports that the volitional release at RAPH concluded at noon today (4/27). Any remaining fish have been forced from the pond. The PIT tag detection equipment has been deactivated. The last file of the year is RPJ07117.L1. 04/24/2007 21:10 bturley@ 02:TestTagFailure,03:TestTagFailure,07:LowLithium,07:TestTagFailure: Test tag failures and low lithiums acknowledged 04/20/2007 07:20 bturley@ 07:LowLithium,07:TestTagFailure: low lithium alarm and test tag failaure acknowledged 04/20/2007 07:20 bturley@ 02:TestTagFailure: test tag failures acknowledged 04/17/2007 07:38 bturley@ 02:TestTagFailure,07:LowLithium,07:TestTagFailure: Test tag failures acknowledged for 02 and 07. Also, low lithium alarm on 07 acknowledged. 04/17/2007 07:37 bturley@ 08:TestTagFailure: Test tag failure acknowledged 04/11/2007 07:03 bturley@ 02:TestTagFailure: test tag failure acknowledged 04/11/2007 07:03 bturley@ 07:LowLithium,07:TestTagFailure: Low Lithium alarm and test tag failure acknowledged 04/09/2007 07:23 bturley@ 08:TestTagFailure: Test tag failure probably due to fish in the field 04/09/2007 07:22 bturley@ 07:LowLithium,07:TestTagFailure: Test tag failures and low lilthium alarm acknowledged 04/09/2007 07:22 bturley@ 04:TestTagFailure: Test tag failure possibly due to fish in the field 04/09/2007 07:21 bturley@ 02:TestTagFailure: Test tag failure acknowledged 04/04/2007 06:37 bturley@ 02:TestTagFailure,07:LowLithium,07:TestTagFailure: Test tag failures noted for 02 and 07. I replaced the lithium battery last week in 07and I'm still getting the alarm. I'll check that out on the next site visit. 03/29/2007 08:36 bturley@ 02:TestTagFailure,07:LowLithium,07:TestTagFailure: Test tag failures acknowledged for coils 02 and 07. I changed the lithium battery in 07, so that alarm should go away from now on. 03/28/2007 20:23 doug@ruf 07:LowLithium,07:TestTagFailure: Testing PostMessageOnly following TASS reconfig for 2007 season. -Doug- 03/24/2007 09:29 bturley@ 02:TestTagFailure,07:LowLithium,07:TestTagFailure: test tag failures and low lithium acknowledged. Will replace lithium on 3/26/07. 03/22/2007 10:57 bturley@ 02:TestTagFailure,07:LowLithium,07:TestTagFailure: Test tag failures acknowledged. Low lithium battery alarm acknowledged. I replaced the lithium batteries to all transceivers during the site installation. 07 must have received a weak/bad battery. I will replace the lithium battery on the next site visit next week. 03/16/2007 09:08 Dave Numerous detections and RPJ indicate volitional release operations began at Rapid River Hatchery on March 15, 2007. 03/15/2007 15:21 bturley@ 02:TestTagFailure,07:TestTagFailure: Test tag failures acknowledged 03/09/2007 09:29 bturley@ 02:TestTagFailure,07:TestTagFailure: Test tag failure acknowledged 03/05/2007 11:50 bturley@ 02:TestTagFailure,07:TestTagFailure: test tag failures acknowledged 03/02/2007 14:18 bturley@ 02:TestTagFailure,07:TestTagFailure: Test tag failures acknowledged 03/02/2007 08:48 dlwarf@r 02:TestTagFailure,07:TestTagFailure: Biomark notified. 02/26/2007 12:13 bturley@ 02:TestTagFailure,07:TestTagFailure: Test tag failures acknowledged 02/19/2007 10:20 bturley@ 02:TestTagFailure: Test tag on coil 02 is non-functional 02/19/2007 10:19 bturley@ 04:LowExcCurrent: Low exciter current alarm occurred during installation and initial coil tuning 02/19/2007 10:19 bturley@ 06:TestTagFailure: Test tag failure acknowledged 02/19/2007 10:18 bturley@ 03:LowExcCurrent: Low exciter current alarm occurred during installation and initial tuning 02/19/2007 10:18 bturley@ 01:TestTagFailure: test tag failure acknowledged 02/19/2007 10:18 bturley@ 07:LowLithium,07:TestTagFailure: Lithium battery was changed on 2/16. The test tag on coil 07 is non-functional for some reason. 02/19/2007 10:17 bturley@ 08:TestTagFailure: Test tag failure acknowledged 02/17/2007 13:13 Dave Brett Turley, BioMark, enabled data collection at Rapid River Hatchery at about 12:40 on Feb. 16. I enabled site checking today, on a 6-hour schedule. 01/01/2007 00:00 PTOC_Bot Annual log file initiation for RPJ #### End of Event Log for RPJ ###