EVENT LOG FOR SITE RPJ The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 04/25/2011 08:46 Scott_Li Shut down site computers for the year. Ran query this year's data set and no file gaps existed. Turned off file submission checking. 04/22/2011 10:22 Brett I uninstalled the antennas, uploaded the last file and shut down the transceivers and computers. The last file uploaded was RPJ11112.D1. Hatchery personnel seined the remaining fish from the pond on Thursday April, 21. 04/15/2011 07:39 Brett Site visit on Monday 4/11. Everything was working well. I archived all data files on backup PC and synced the time on the two PC's. I checked the tune and ran test tag diagnostic on all transceivers. I decided not to test antennas with the stick tags because fish started actively moving through the antennas while I was there. System shutdown has changed from Thursday 4/21 to Friday 4/22. 04/05/2011 07:36 Brett O&M visit on 4/4/11. I checked the tune on all transceivers and tested with timer tag diagnostic. Everything is working well. Also, I synced the computer times and archived the files on the backup PC. The date in which the final fish will be pushed out and the pond drained is 4/21. 03/28/2011 14:33 Brett Site visit on 3/28/11.Checked tune on all transceivers and tested with timer tag and stick tags. Archived data on backup PC. Everything looking very good. The fish are moving very slowly out of the pond. The hatchery manager may lower the pond level today or tomorrow to help push the fish out. 03/23/2011 07:15 Brett Site visit on Monday 3/21. Everything looked good. I checked the tune on all transceivers and checked efficiency with their timer tags. After the first night of releases, the fish movement has decreased significantly. 03/18/2011 13:32 Brett Per Rapid River's hatchery manager, the volitional release officially began on Tuesday 3/15 at about 10:00 am PST. 03/15/2011 06:22 Brett O&M visit on 3/14/11. Everything looking good and ready for the release. I was told the release would be on 3/14. However, the hatchery didn't get the OK from headquarters. The release could start as early as the afternoon of 3/15. I will post the release start time as soon as I get the word from the hatchery. 03/09/2011 07:28 Brett There was a four hour power outage at the hatchery yesterday which caused a 5 hour 21 minute data gap. I filled the gap with the RPJ11067.D1.TMP file that was in the Minimon data file. There was no additional data on the secondary data computer. 02/28/2011 16:06 Brett According to hatchery personnel, The volitional release is set to begin on March 14. 02/28/2011 15:40 Brett I replaced the CPU board on transceiver 02 with a spare. The screen was blanked out and the transceiver was emitting a solid beep. It also could not detect the timer tag. The new CPU board seems to have fixed the problem. The transceiver now reads tags and seems to be working fine. 02/17/2011 08:58 Brett Apparently there was a power outage at Rapid River hatchery on 2/16. The computers shut down without closing out file RPJ11047.E1. I added a closing line to the bottom of the file and uploaded it to fill the 2 hour 29 minute data gap. It looks like the transceivers also lost power for over two hours. 02/17/2011 08:46 bturley@ 02:TestTagFailure: Test tag failures acknowledged. I'll check this out on my next site visit. 02/08/2011 15:24 Brett The antennas and transceivers were installed today (2/8/11). The transceivers were powered up at approximately 2:45 pm PST. Initially, everything looks good. The transceivers came into tune immediately and there were no comm issues or any other problems. My understanding is that fish tagging in the pond will begin on Monday, 2/14. The fish release will begin in mid-March. I don't have the exact release day yet. I will post it when I find out. 02/04/2011 08:38 Scott_Li Turned on File submission checking for this site and engaged the auto upload process. Uploads set to every 3 hrs. 01/21/2011 07:56 Scott_Li Reconfigured the data collection platform for the newly installed DSL line along with other things. All connectivity was tested and no problems to report. 01/01/2011 00:00 PTOC_Bot Annual log file initiation for RPJ #### End of Event Log for RPJ ###