EVENT LOG FOR SITE RPJ The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 11/04/2013 07:24 Alan The 32 minute file gap on 11/2/2013 is inconsequential as the site is dewatered. 10/01/2013 07:51 Alan The file gap on 9/26/2013 is inconsequential as the site was dewatered. 08/22/2013 07:50 Alan User: Alan. Site: RPJ. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: Site down, clearing TASS. Error: 02: Test Tag Failed. 03: Test Tag Failed. 04: Test Tag Failed. 06: Test Tag Failed. 08: Test Tag Failed. 02: Exc current low. 03: Bad Exc. Freq.. 04: Bad Exc. Freq.. 08/19/2013 09:24 Alan User: Alan. Site: RPJ. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: Site down, clearing TASS. Error: 02: Bad Exc. Freq.. 03: Bad Exc. Freq.. 04: Bad Exc. Freq.. 06: Bad Exc. Freq.. 08: Bad Exc. Freq.. 02: Test Tag Failed. 03: Test Tag Failed. 04: Test Tag Failed. 06: Test Tag Failed. 08: Test Tag Failed. 02: Exc current low. 08: Analog comm. 08: Exc. Power low. 05/01/2013 07:29 thumphre User: thumphrey. Site: RPJ. Comments: This site was shut down at 1:00 PDST (12:00 PST).. Event date: 4/29/2013 1:00:00 PM. Site activity: down 05/01/2013 07:27 thumphre User: thumphrey. Site: RPJ. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: Clearing all errors prior to posting a season shut down.. Error: 05/01/2013 07:17 dchase User: dchase. Site: RPJ. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: This site was de- commissioned for the season on Monday.. Error: 01: Bad Exc. Freq.. 02: Bad Exc. Freq.. 03: Bad Exc. Freq.. 04: Bad Exc. Freq.. 05: Bad Exc. Freq.. 06: Bad Exc. Freq.. 07: Bad Exc. Freq.. 08: Bad Exc. Freq.. 01: Bad Osc. Freq.. 02: Bad Osc. Freq.. 03: Bad Osc. Freq.. 04: Bad Osc. Freq.. 05: Bad Osc. Freq.. 06: Bad Osc. Freq.. 07: Bad Osc. Freq.. 08: Bad Osc. Freq.. 01: Exc current low. 03: Exc current low. 04: Exc current low. 05: Exc current low. 06: Exc current low. 07: Exc current low. 08: Exc current low. 01: Test Tag Failed. 02: Test Tag Failed. 03: Test Tag Failed. 04: Test Tag Failed. 05: Test Tag Failed. 06: Test Tag Failed. 07: Test Tag Failed. 08: Test Tag Failed. 04/29/2013 13:32 Troy At the site 4/29/2013 to help remove the antennas for the season. The transceivers were put in standyby at 12:00 PST. They were then removed with the help of site personnel. The caps were placed on the 6 in opening on the bottom of the transceiver enclosures. The cap on the middle enclosure is cracked and should be replaced. It was taped up to try and eliminate critters from getting into the enclosure. The M4 machine (formally Minimon PC2) was changed from a M4 P machine to a M4 S machine at 12:35 PST. Minimon was then shut down on PC1. M4 V 1.5.4.0 was then installed on PC1 and configured to be the P machine so that all labling would match. The files were incremented to match those on the now S machine. RPJ-2013-S-119-013 and 014 can be used to patch any data gaps that might exits. However it should be noted that all transceivers were disconnected by then and in standby. The now S machine was upgraded from 1.5.1.0 to 1.5.4.0 and M4 alerts were turned on to test then turned back off as the transceivers will remain on but in standby until next season. The site configurations will be emailed in. 04/22/2013 06:43 thumphre User: thumphrey. Site: RPJ. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: Clearing new TASS.. Error: 07: Analog comm. 07: Exc. Power low. 04: Test Tag Failed. 06: Test Tag Failed. 04/15/2013 07:08 alan@bay 04:TestTagFailure: A PIT tag was in the field when the timer tag was fired. 04/09/2013 07:01 darren@b 04:TestTagFailure,06:TestTagFailure: Clearing TASS. These systems will be monitored for future alarms. 03/27/2013 06:53 scottl User: scottl. Site: RPJ. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: Noted. Error: 02: Test Tag Failed. 03/22/2013 09:47 alan@bay 02:TestTagFailure: No apparent reason for this one-time alarm. PTAGIS Field Operations will continue to monitor. 03/12/2013 07:41 Troy@bay 04:TestTagFailure: Cleared using new TASS. 03/12/2013 07:40 Scott_Li Site personnel are going to try and flush the stuck tag from the antenna array. Not much they can do other than pull the antenna and look around for it. Ralph to call when this has been complete. 03/12/2013 07:38 thumphre User: thumphrey. Site: RPJ. Antenna Group Name: All antenna groups were cleared. Antenna: All antennas were cleared. Comments: This alarm is due to a tag being stuck in the field. Site personell are attempting to clear the tag from the field.. Error: 04: Test Tag Failed. 02/28/2013 08:21 Alan Site personnel report that a power outage occurred from ~11:40 PST 2-27- 2013 to ~00:40 PST 2-28-2013. File RPJ13058.H9 was created from a tmp file to help fill the gap. No further data exist to for this gap. 02/21/2013 07:38 Alan Platform maintenance caused a file gap on 2-20-2013. A closing timestamp was appended to RPJ13051.F1. Regarding the remaining file gap, Troy reports that no activity was observed on the M4 machine while PC1 was down. 02/20/2013 15:43 Troy All Transceiver Lithium batteries were replace 2/6/2013. All Transceiver UPS batteries were replaced 2/20/2013. 02/20/2013 15:32 Troy At the site to take over maintenance and document assest. M4 was found to have an issue. This was delt with by re-booting the machine. A call was placed to John T and it was discovered that the UI had lost it's connection to the service. PSMFC will keep an eye on this. Pictures were taken of the equipment in the pittag room and all the transceivers, Serial numbers assets tags were recored. No other problems to report. 02/15/2013 09:21 Scott_Li Per Frontier , There is a internet outage within the 208 area code that is effecting the DSL service at this facility. Techs are working on the issue, no ETR at this time. 02/06/2013 08:38 Brett RPJ antennas were installed yesterday and site is up and running. I brought transceiver 08 back to Boise because it was re-booting whenever I sent it a DRS command and when I would cycle through parts of the menu. Fish tagging by Idaho Fish and Game is set for next week with the release occurring in mid March. 01/03/2013 08:41 Scott_Li Sites were upgraded to M4 ver. 1.5.1.0 per instructions listed on Basecamp. 01/02/2013 00:00 PTOC_Bot Annual log file initiation for RPJ #### End of Event Log for RPJ ###