EVENT LOG FOR SITE SFL Most recent activity to be listed first. First line of each entry lists date, time and who is reporting. Subsequent lines of each entry aligned under Time column. Do not use tabs, only spaces. Date Time Who What ---------- ----- -------- ----------------------------------------------- 11/06/2009 11:13 CHARLIE 11/3/09 09:00 - SFL PITIS system dismantled and removed for the Winter. Expected reinstall in early Spring, 2010. 10/29/09 20:44 - SFL System power failure. Problem was not addressed due to pending removal for the Winter. No further interrogation data to be collected at this time. 07/22/2009 15:15 CHARLIE 7/22/09 at 1330 - SFL - Downloaded MUX. Memory was full and data was overwritten. Data gap from 7/16/09 at 1223 through 7/20/09 at 0744. 07/02/2009 15:36 CHARLIE 4/11/09 at 1455 - SFL - Interrogation system installation completed and turned on by US Fish and Wildlife Service crew. 4/13/09 at 1000 - SFL - From US Fish and Wildlife crew notes: System was shut down at approximately 1000 for about four hours for tuning. System back on at approximately 1400. System run continuously from this point forward. 4/22/09 at 1219 - SFL - Transceiver ID changed to "F0" and antenna IDs changed from "01" and "02" to "F1" (upstream) and "F2" (downstream). 06/16/2009 14:54 Dave Information for activities prior to 2009, if available, will be reported in the 2009 event log. ####End of Event Log for SFL###