EVENT LOG FOR SITE TRC The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 11/18/2009 11:21 Jezorek From October 12, 2009 at 15:00 hrs to October 21, 2009 at 16:00 hrs power was lost to the TRC site. Ian Jezorek 01/15/2009 15:18 Jezorek The TRC site has been non-operational since 12/10/08 due to power problems and weather (snowed out). The road has been plowed now and on 1/15/09 Ian Jezorek and Carrie Munz were able to get in, dig out, and get the system up and running again. Antennas number 1, 2, and 6 are not responding and probably have detached cords due to the high water last week. Once the water drops a bit more we should be able to get in and reattach those antennas. Ian 01/01/2009 00:00 PTOC_Bot Annual log file initiation for TRC #### End of Event Log for TRC ###