EVENT LOG FOR SITE UCT The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 08/16/2013 12:30 Ben UCT was installed on 3/7/2012. The detection system consisted of four, 15' antennas installed in hybrid configuration, spanning the majority of the wetted width during base flows. The antennas were operated by an FS1001M. A 24 VDC battery bank powered the detection system. The detection system was removed on 6/13/2012. The detection system did not operate from 4/6 to 4/13 and from 5/13 to 5/18 due to low voltage in the battery bank. Ben Truscott WDFW #### End of Event Log for UCT ###