EVENT LOG FOR SITE UMT Most recent activity to be listed first. First line of each entry lists date, time and who is reporting. Subsequent lines of each entry aligned under Time column. Do not use tabs, only spaces. Date Time Who What ---------- ----- -------- ----------------------------------------------- 01/09/2013 11:23 Nicole Zack sends the following information: 1/13/12: UMT site is operational at 14:30:00 4/25/12: Antenna 2 sustained a crack during high flows around 19:00:00 and is no longer working. 8/2/12: Antenna 2 was replaced at 12:15:00 and is working properly. 8/7/12: Efforts to lower all antennas into the substrate and angle them with the river’s gradient have taken place to protect them during future high water events. 07/03/2012 10:05 Nicole Initial event log entry for new interrogation site UMT - Upper mainstem Teanaway River. Gabe Temple (Gabriel.temple@dfw.wa.gov) is the site data steward. Zack Mays (zack.mays@dfw.wa.gov) is the technical POC. ####End of Event Log for UMT###