EVENT LOG FOR SITE VC1 The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 11/25/2010 10:36 Jody 11/22/2010 VC1 was down for operational maintenance from 11:20 to 12:00 PST and to add a Campbell Scientific CR1000 datalogger and voltage monitoring module to allow for real-time site monitoring. Data is now being automatically downloaded to the QCI ISEMP's Pitarray server in Boise and daily interrogation files uploaded to PTAGIS. 08/17/2010 15:09 Gabriel 7/20/2010 - Site down from 6:00am to 7:28am (PST) and from 7:40am to 8:48 to tune site, and update computer. 8/9/2010 - Site down from 6:00am to 9:05am (PST) to add Acopian DC to DC converter to the input power line of MUX. This lowered average and peak noise on all four antennas. 08/12/2010 13:29 Dave I transferred Data Stewardship from Steve Achord to Chris Jordan, and assigned Gabriel Brooks as the technical point of contact. I replaced Steve, Bill, and Gary Gadwa, with Chris and Gabriel to received automated alerts if we don't receive data files at least once per day. 03/14/2010 14:29 Dave I manually modified the FILE CLOSED time from "03:00" to "04:00" to circumvent a processing error associated with the shift from PST to PDT. 01/01/2010 00:00 PTOC_Bot Annual log file initiation for VC1 #### End of Event Log for VC1 ###