EVENT LOG FOR SITE VC1 The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 12/12/2011 15:40 Cameron 12/12/2011 15:40 Cameron The PIT tag array antennas at Valley Creek (VC1) remain in their original configuration. On February 3 through February 7, 2011 the transceiver malfunctioned and resulted in the loss of 95 hours of PIT tag observations and status data (DRS). A failure in the battery switcher components resulted in the site being operational for a 4 hour time period every 4 hours beginning on June 21 through July 7, 2011. Over this time period 185 hours of PIT tag observations and DRS data was not collected. An additional 15 hours of down time occurred during maintenance on September 12 and September 22, 2011. 12/12/2011 14:51 Cameron 12/12/11 14:50 Cameron The antennas at VC1 remain in their original configuration. On February 3 through February 7, 2011 the transceiver malfunctioned and resulted in the loss of 95 hours of tag and status data. A failure in the battery switcher components resulted in the site being operational for a 4 hour time period every 4 hours beginning on June 21 through July 7, 2011. Over this time period 185 hours of tag and status data was not collected. An additional 15 hours of down time occurred during maintenance on September 12 and September 22, 2011. 03/04/2011 07:13 Jody Power Outage at VC1 due to bad battery switcher: 2/03/2011 13:00 - 2/07/2011 17:00 2/07/2011 battery switcher repaired Power Outage at VC1 due to bad battery in battery bank: 2/15/2011 17:45 - 2/15/2011 20:00 2/15/2011 23:10 - 2/16/2011 01:40 2/16/2011 05:00 - 2/16/2011 07:50 2/19/2011 battery bank replaced, new battery switcher installed VC1 MUX was put in stand-by for VC2 noise testing: 2/19/2011 15:30 - 2/19/2011 18:30 2/20/2011 0:600 - 2/20/2011 07:30 01/01/2011 00:00 PTOC_Bot Annual log file initiation for VC1 #### End of Event Log for VC1 ###