EVENT LOG FOR SITE VC2 The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 10/07/2010 14:10 Jody 9/22/2010 - Site was down from 11:22 a.m. until 12:15 pm 9/22/2010 for physical site configuration change to ISEMP standard equipment and configuration. Significant alterations include: power supplied using a thermal electric generator, data storage using CR1000 datalogger, site communications using cellular modem, air temperature probe added, water temperature probe added, water depth transducer added. Automatic data uploads are currently being sent to QCI Boise PIT Array Server to be uploaded to PTAGIS. 08/31/2010 17:35 Dave There are 254 detection records for 125 unique tags detected at VC2 between 7/24/10 13:52:33 and 8/24/10 21:02:19. These detections were mapped to site configuration #110, but in fact were detected after the new configuration #120 (with two arrays of three antennas each) was deployed. The new configuration was not reported to PTAGIS until after the fact. All VC2 detection data processed after 8/25/10 23:00 are correctly mapped to configuration #120. 08/17/2010 15:22 Gabriel 8/17/2010 - Stopped Minimon to perform a buffer download. Reset reader because VTT is not being buffered. 08/17/2010 15:19 Gabriel 7/28/2010 - Site down from 16:21 until 19:59 on 8/5/2010 due to solar panel failure. 08/17/2010 15:16 Gabriel 7/22/2010 - Site down from 9:45am until 7/24/2010 at 12:20pm (PST) for antenna upgrade. Three 10' antennas were removed and replaced with six 20' antennas arranged in two rows that span the stream from bank to bank. Installed new transceiver box and moved MUX to closer to stream. 08/12/2010 13:29 Dave I transferred Data Stewardship from Steve Achord to Chris Jordan, and assigned Gabriel Brooks as the technical point of contact. I replaced Steve, Bill, and Gary Gadwa, with Chris and Gabriel to received automated alerts if we don't receive data files at least once per day. 04/12/2010 07:34 Bill_W. Communications to VC2 has been down 3/29/10 because of Satellite Internet has been inadvertently turned off. It will be restored the week of 4/12/10. Bill W. NOAA Fisheries 03/14/2010 14:29 Dave I manually modified the FILE CLOSED time from "03:00" to "04:00" to circumvent a processing error associated with the shift from PST to PDT. 01/01/2010 00:00 PTOC_Bot Annual log file initiation for VC2 #### End of Event Log for VC2 ###