EVENT LOG FOR SITE VC2 The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 12/12/2011 15:42 Cameron 12/12/2011 15:42 Cameron No downtime was recorded at Valley Creek (VC2) during 2011. On March 26, 2011 a DC battery switcher was installed to help reduce noise levels resulting from noise entering the system through the long unshielded power cable. In October, 2011 a 250 gallon propane tank was added, replacing the four 25 gallon tanks. 03/04/2011 07:15 Jody 2/19/2011 13:45 - 15:10, VC2 MUX was re-tuned 01/01/2011 00:00 PTOC_Bot Annual log file initiation for VC2 #### End of Event Log for VC2 ###