EVENT LOG FOR SITE VC2 The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 11/29/2012 08:13 Cameron On May 19, 2012 antenna 5 became dislodged during high flows. The antenna was replaced on September 13, 2012. In addition, the antennas were re-rocked. The transceiver started having antenna current issues in July, 2012. Antenna current would increase to unsafe levels at which point the transceiver would place the antennas into standby mode. The transceiver was replaced in July and sent back for repairs. After the repairs the transceiver was re-installed but continued to have the same issue. The transceiver was again replaced in September 2012. 01/01/2012 00:00 PTOC_Bot Annual log file initiation for VC2 #### End of Event Log for VC2 ###