EVENT LOG FOR SITE WPT The first line of each entry contains a date/time stamp & who is reporting. The most recent entry is listed first. Date Time Who ---------- ----- -------- 08/16/2013 12:30 Ben WPT was installed on 3/8/2012. The detection system consisted of two, 15' antennas installed in pass through configuration, spanning the majority of the wetted width during base flows. The antennas were operated by Allflex RM310 reader boards. Data from each antenna was stored on an Acumen DataBridge. A 6 VDC battery bank powered the detection system. The detection system did not operate from 4/23 to 5/7 due to high flows that broke the antennas. The dectection system was broken again on 5/13 and was not reinstalled. The detection system was planned to operate until early June. Ben Truscott WDFW #### End of Event Log for WPT ###