Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

Search by typing either a site name, site code, organization, or site type.

1BC - Upper Big Creek, Yakima Basin

Status:   Active - Operational
Site Type: Instream Remote Detection System  |  Organization: U.S. Fish and Wildlife Service
General Operational Period: Year Round
Start Date: 5/14/2019 12:00 AM

Upper Big Creek antennas are located South West of the I-90 just up stream of Kittitas Reclamation District (KRD) supplementation and below KRD Canal. The antennas are two pass throughs located approximately 30 feet from one another spanning Big Creek.

Current Operations

Last File Loaded: 1BC-2021-246-P-02.xml
Date Last File Loaded: 10/5/2021 9:41 AM
Date Last File Opened: 9/3/2021 11:06 AM
Date Last File Closed: 9/29/2021 12:27 PM
Last Observation Tag: 3DD.003D2F1393
Last Observation Date: 9/29/2021 12:25 PM
Detection Summary: Last Day's Observations

Contacts

Data Steward:

Robert Randall
robert_randall@fws.gov
509-433-1455

Location

Coordinates: 47.200828, -121.115768  |  River Km: 539.315.002

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2021
2020 8/6/2020 12:00 AM 12/8/2020 12:00 AM Start and end dates based on timer tags. See event logs for additional operational information.
2019 5/14/2019 12:00 AM First year of operation. Site was initially installed with the antennas backwards to PTAGIS convention - antenna 02 was upstream and 01 was downstream. This was changed on December 18.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  12/18/2019
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

Event Date Event Type Comments
2/25/2021 9:56:00 AM SiteUp Site will downloaded every other week from initial startup.
12/7/2020 4:01:00 PM SiteDown Site powered down due to winter light conditions and effects of snow pack.
7/23/2020 3:00:00 PM SiteUp Site Turned on

No Archived Event Logs