Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

Search by typing either a site name, site code, organization, or site type.

3D2 - Middle-1 of 3D Side Channel

Status:   Decommissioned
Site Type: Instream Remote Detection System  |  Organization: U.S. Fish and Wildlife Service
General Operational Period: Year Round
Start Date: 3/27/2013 10:00 AM
End Date: 1/2/2017 8:04 PM

This is a single pass through antenna near the bottom of the 3D side channel, before its convergence with Brennegan Creek, to the Entiat River. The site is located on Entiat River at river kilometer 42.7. The antenna spans across the width of the channel. The site equipment used to decode full duplex tags is an Allflex reader board and data is stored on an Acumen data logger. A half-duplex timer tag is strapped to the antenna itself. Antenna ID is 11. Timer tags are activated and set to 31 minute intervals. The antenna is configured in a pass through position and anchored with 2 t-posts into the substrate. Site was decomissioned in January 2017

Contacts

Primary Contact:

Nicholas Albrecht
nicholas.albrecht@dfw.wa.gov
509-892-1001 x303

Data Steward:

Tom Desgroseillier
thomas.desgroseillier@dfw.wa.gov
509-664-3148 x275

Location

Coordinates: 47.891860, -120.448000  |  River Km: 778.043

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2017 1/1/2017 12:00 AM 1/2/2017 8:04 PM Site down due to broken antenna and won't be reinstalled or repaired
2016 1/1/2016 12:00 AM 1/1/2017 12:00 AM
2015 1/1/2015 12:00 AM 1/1/2016 12:00 AM
2014 1/1/2014 12:00 AM 1/1/2015 12:00 AM Site down June 11-24 due to equipment failure.
2013 3/27/2013 10:00 AM 1/1/2014 12:00 AM First year of operations.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  3/27/2013
End Date:  1/3/2017

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

Photos

Photos are contributed from stewards of the site.

Event Log Summary

This displays the last 25 events, to see the full history, log in to the Dashboard and go to Interrogation Site > Event Logs.

Event Date Event Type Comments
1/13/2017 9:30:00 AM General Site visited. Site was down on arrival. Data downloaded and tuning checked.
1/2/2017 8:04:00 PM SiteDown Site down. Site is down due to a broken antenna. Site will not be re-installed or repaired for the foreseeable future.
12/30/2016 10:30:00 AM General Site visited. Data downloaded and tuning checked. Site fully operational.
12/13/2016 10:50:00 AM General Site visited. Data downloaded and tuning checked. Site fully operational.
12/2/2016 10:20:00 AM General Site visited. Data downloaded, tuning checked, and solar batteries replaced. Site fully operational.
11/28/2016 9:33:00 AM SiteUp Site up. Site is now fully operational.
11/28/2016 9:32:00 AM General Site visited. Tuning checked. Site fully operational.
11/15/2016 9:53:00 AM SiteDown Site down. Site was down from 11/15 to 11/28. Site was operational, but data collected was lost.
11/15/2016 9:52:00 AM General Site visited. Data downloaded and tuning checked. Site fully operational.
10/30/2016 10:30:00 AM General Site visited. Data downloaded and tuning checked. Site fully operational.
10/12/2016 10:38:00 AM General Site visited. Data downloaded and tuning checked. Site fully operational.
9/29/2016 11:15:00 AM General Site visited. Data downloaded and tuning checked. Site fully operational.
9/14/2016 9:30:00 AM General Site visited. Data downloaded and tuning checked. Site fully operational.
8/30/2016 9:57:00 AM General Site visited. Data downloaded and tuning checked. Site fully operational.
8/16/2016 11:32:00 AM General Site visited. Data downloaded and tuning checked. Site fully operational.
7/29/2016 1:48:00 PM General Site visited. Data downloaded and tuning checked. Site fully operational.
7/10/2016 12:30:00 PM General Site visited. Data downloaded and tuning checked. Site fully operational.
6/28/2016 11:45:00 AM General Site visited. Data downloaded and tuning checked. Site fully operational.
6/18/2016 12:15:00 PM General Site visited. Data downloaded and tuning checked. Site fully operational.
6/2/2016 9:10:00 AM General Site visited. Data downloaded and tuning checked. Site fully operational.
5/16/2016 9:30:00 AM General Site visited. Data downloaded and tuning checked. Site fully operational.
5/4/2016 9:05:00 AM General Site visited. Data downloaded and tuning checked. Site fully operational.
4/29/2016 9:14:00 AM General Site visited. Data downloaded and tuning checked. Solar connection was also fixed. Site fully operational.
4/25/2016 1:15:00 PM General Site visited. Data downloaded and tuning checked. Tried repairing the solar connection. Site fully operational.
4/21/2016 1:30:00 PM General Site visited. Data downloaded and tuning checked. Site fully operational.

Archived Event Logs