3D4 - Bottom of 3D Side Channel
Status: DecommissionedGeneral Operational Period: Year Round
Start Date: 3/27/2013 12:00 AM
End Date: 11/28/2016 9:30 AM
This is a single pass through antenna near the bottom of Brennegan Creek and 3D side channel to the Entiat River, at its convergence with the Entiat River. The site is located on Entiat River at river kilometer 42.7. The antenna spans across the width of the channel. The site equipment used to decode full duplex tags is an Allflex reader board and data is stored on an Acumen data logger. A half-duplex timer tag is strapped to the antenna itself. Antenna ID is 13. Timer tags are activated and set to 31 minute intervals. The antenna is configured in a pass through position and anchored with 2 t-posts into the substrate. Site was decomissioned in December 2016
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2016 | 2/4/2016 12:00 AM | 11/28/2016 9:30 AM | Site is down due to a lack of power. Site will not be re-installed or repaired for the foreseeable future. |
2015 | 1/1/2015 12:00 AM | 12/11/2015 12:00 AM | |
2014 | 1/1/2014 12:00 AM | 12/20/2014 12:00 AM | Site down April 17-May 26 due to high water. Site down October 12-November 4 due to equipment failure. |
2013 | 3/27/2013 12:00 AM | 1/1/2014 12:00 AM | First year of operations. |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
Pass Through Antenna | 31 | 13 |
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
Photos
Event Log Summary
This displays the last 25 events, to see the full history, log in to theĀ Event Logs.
Event Date | Event Type | Comments |
---|---|---|
1/13/2017 10:00:00 AM | SiteDown | Site down. Site is still down. Site will not be re-installed or repaired for the foreseeable future. |
12/30/2016 10:10:00 AM | SiteDown | Site down. Site is currently not functioning and will not be re-installed or repaired for the foreseeable future. |
12/16/2016 1:04:00 PM | General | Site visited. Site is still down due to power issues. |
12/13/2016 10:17:00 AM | General | Site visited. Site was down on arrival due to power issues. Channel is currently dry/frozen. Site will be repaired in the near future. |
11/28/2016 9:30:00 AM | SiteDown | Site down. Site went down due to power issues. Channel is currently dry/frozen. Site will be repaired in the near future. |
11/28/2016 9:21:00 AM | SiteUp | Site up. Site is now fully operational. |
11/28/2016 9:20:00 AM | General | Site visited. Tuning checked. Site fully operational. |
11/15/2016 9:43:00 AM | SiteDown | Site down. Site was down from 11/15 to 11/28. Site was operational, but data collected was lost. |
11/15/2016 9:42:00 AM | General | Site visited. Data downloaded and tuning checked. Site fully operational. |
10/30/2016 10:27:00 AM | General | Site visited. Data downloaded and tuning checked. Site fully operational. |
10/12/2016 10:19:00 AM | General | Site visited. Data downloaded and tuning checked. Site fully operational. |
9/29/2016 11:00:00 AM | General | Site visited. Data downloaded and tuning checked. Channel is dry. Site fully operational. |
9/21/2016 9:38:00 AM | General | Site visited. Replaced voltage reducer. Site is fully operational. |
9/14/2016 9:23:00 AM | General | Site visited. Data downloaded and tuning checked. Voltage reducer needs to be replaced. Channel is dry. Site fully operational. |
8/30/2016 9:48:00 AM | General | Site visited. Data downloaded and tuning checked. Channel is dry. Site fully operational. |
8/16/2016 11:40:00 AM | General | Site visited. Data downloaded and tuning checked. Channel is almost dry. Site fully operational. |
7/29/2016 1:40:00 PM | General | Site visited. Data downloaded and tuning checked. Site fully operational. |
7/10/2016 12:40:00 PM | SiteUp | Site up. Data downloaded and tuning checked. Voltage reducer was fixed. Site fully operational. |
6/30/2016 2:43:00 AM | SiteDown | Site Down. Site went down due to a malfunction with the voltage reducer. |
6/28/2016 12:00:00 PM | General | Site visited. Data downloaded and tuning checked. Site fully operational. |
6/18/2016 12:20:00 PM | General | Site visited. Data downloaded and tuning checked. Site fully operational. |
6/2/2016 9:15:00 AM | General | Site visited. Data downloaded and tuning checked. 12V batteries were replaced. Site fully operational. |
5/16/2016 9:45:00 AM | General | Site visited. Data downloaded and tuning checked. Site fully operational. |
5/4/2016 9:30:00 AM | General | Site visited. Data downloaded and tuning checked. Site fully operational. |
4/29/2016 9:45:00 AM | General | Site visited. Data downloaded and tuning checked. Site fully operational. |