Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

AEN - Aeneas Creek Temporary Array

Status:   Active - Operational
Site Type: Instream Remote Detection System  |  Organization: Colville Confederated Tribes
General Operational Period: Seasonally
Start Date: 3/5/2014 12:00 AM

AEN is a permanent PIT tag interrogation site on Aeneas Creek. Aeneas Creek enters the Okanogan River at RKM 85.3, approximately 6.7 km down river from the town of Tonasket, WA. The AEN site is located approximately 0.2 km upstream from the confluence of the Okanogan River. The site consists of a single 10 foot antenna anchored upright for pass-through detection. The antenna spans the wetted width of the channel at base flow. When installed in 2014 AEN was equipped with an Allflex RM 310 reader and an Acumen Data logger powered by batteries. In August 2018, the site was updated with a 10 foot HDPE antenna, IS1001 reader, and solar panels to provide power to the 12V battery bank.

Current Operations

Last File Loaded: AEN-2024-106-P-001.json
Date Last File Loaded: 4/22/2024 4:10 PM
Date Last File Opened: 4/15/2024 8:20 AM
Date Last File Closed: 4/22/2024 10:14 AM
Last Observation Tag: 3DD.003DA292FF
Last Observation Date: 4/21/2024 5:09 AM
Detection Summary: Last Day's Observations

Contacts

Data Steward:

Randy Johnson
Randy.Johnson.FNW@colvilletribes.com
509-634-1030

Location

Coordinates: 48.658578, -119.476197  |  River Km: 858.086.001

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023 1/4/2023 12:00 AM 1/1/2024 12:00 AM Start and end dates based on timer tags.
2022 1/1/2022 12:00 AM 12/23/2022 12:00 AM Start and end dates based on timer tags.
2021 1/1/2021 12:00 AM 1/1/2022 12:00 AM Start and end dates based on timer tags.
2020 1/1/2020 12:00 AM 1/1/2021 12:00 AM Start and end dates based on timer tags. See event logs for additional operational information.
2019 2/21/2019 12:00 AM 12/30/2019 12:00 AM Start and end dates based on timer tags.
2018 1/3/2018 12:00 AM 12/20/2018 3:30 PM Allflex RM310 reader and Acumen data logger replaced with IS1001 in August.
2017 3/14/2017 12:00 AM 12/31/2017 12:00 PM Start and end dates based on first File Created and last File Closed date from files loaded in 2017.
2016 3/2/2016 12:00 AM 10/3/2016 12:00 AM
2015 2/2/2015 12:00 PM 11/17/2015 12:00 PM
2014 3/5/2014 12:00 AM 11/21/2014 12:00 AM Site removed from operation June 3-August 21.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  12/21/2018
End Date:  ----

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

Event Date Event Type Comments
12/11/2023 9:41:00 AM SiteUp

Site back online, batteries recharged enough to operate antenna.

12/8/2023 4:00:00 PM SiteDown

Site down due to low voltage

2/21/2019 12:00:00 PM SiteUp Site activated for the year. Solar is now able to keep up with power demands.
12/20/2018 12:00:00 PM SiteDown Site shut down for winter, solar could no longer meet power requirements.
8/1/2018 7:24:00 AM General Site updated with a 10 foot HDPE antenna, IS1001 reader, and solar panels to provide power to the 12V battery bank.
10/13/2016 10:30:00 AM SiteDown Site deactivated
9/28/2016 11:00:00 AM SiteUp Site reactivated for MR study
8/18/2016 2:00:00 PM SiteDown Site deactivated
2/17/2016 11:15:00 AM SiteUp Site install and setup
11/17/2015 10:00:00 AM SiteDown System shutdown and removal.
7/24/2015 9:00:00 AM SiteUp System reactivated.
6/25/2015 12:00:00 PM SiteDown System shutdown.
2/2/2015 12:00:00 PM SiteUp Install seasonal Allflex single antenna system.
11/21/2014 2:00:00 PM SiteDown System shutdown and removal.  
8/21/2014 10:00:00 AM SiteUp Reactivate site.
8/14/2014 3:16:46 PM General Registered new interrogation site AEN.
6/3/2014 12:00:00 PM SiteDown System shut down.  
3/5/2014 10:00:00 AM SiteUp Install seasonal Allflex single antenna system.

No Archived Event Logs