Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

BBA - Big Bear Creek Array

Status:   Active - Operations Unspecified
Site Type: Instream Remote Detection System  |  Organization: Idaho Dept. of Fish and Game
General Operational Period: Seasonally
Start Date: 1/1/2018 12:00 AM

The Big Bear Creek Array is located in Big Bear Creek about 1.3 river kilometers from the confluence with the Potlatch River. Two 40 ft. Biomark litz cord antennas in series powered by two stand-alone IS1001 readers, replaced the previous configuration of two 20 ft. antennas in one row and a QuBE-IS1001 controller in February 2021.

Current Operations

Last File Loaded: BBA-2023-304-P-011.json
Date Last File Loaded: 11/1/2023 2:40 AM
Date Last File Opened: 10/31/2023 9:01 PM
Date Last File Closed: 11/1/2023 12:01 AM
Last Observation Tag: 3DD.0077B16151
Last Observation Date: 6/21/2023 8:34 PM
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

Jason Fortier
Jason.fortier@idfg.idaho.gov
208-799-5010

Data Steward:

Brian Knoth
Brian.Knoth@idfg.idaho.gov
208-750-4230

Location

Coordinates: 46.627882, -116.650795  |  River Km: 522.224.024.023.002

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023 2/2/2023 12:00 AM 11/2/2023 12:00 AM Start and end dates based on timer tags.
2022 4/15/2022 12:00 AM 5/11/2022 12:00 AM Start and end dates based on timer tags.
2021 2/3/2021 12:00 AM 5/12/2021 12:00 AM Start and end dates based on timer tags.
2020 3/5/2020 12:00 AM 10/9/2020 12:00 AM Start and end dates based on timer tags. See event logs for additional operational information.
2019 1/1/2019 12:00 AM 5/28/2019 12:00 PM Start and end dates based on file open and close dates.
2018 1/1/2018 12:00 AM 1/1/2019 12:00 AM

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  2/1/2021
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

Event Date Event Type Comments
10/9/2020 8:40:00 AM General Site experienced power outages from May 11th until May 13th and August 20 until September 30.

No Archived Event Logs