Interrogation Site Metadata
BBT - Touchet River at Bolles Bridge
Status: Active - OperationalGeneral Operational Period: Year Round
Start Date: 11/1/2011 12:00 AM
BBT is a permanent instream PIT tag interrogation site located approximately 200 feet above the State HWY 124 bridge on the Touchet River, near Bolles Road, at River Kilometer 65.2. The site consists of two rows of antennas, with each row nearly spanning the wetted width of the channel during base flows. Each row consists of 3 20-foot HDPE antennas, installed in flat-plate configuration (the original flat plate antennas were replaced in 2018). Each antenna is powered by a Biomark IS1001 (ACN) and the ACNs are connected to a Biomark IS1001-MC (MTS), which was installed in 2018. Prior to that the site operated with a FS2001M multiplexor transceiver. The antennas were built and installed by WDFW. The site is powered by direct power from grid. BBT has remote communication abilities provided by a cellular modem.
Current Operations
Last File Loaded: | BBT-2024-116-P-004.json |
Date Last File Loaded: | 4/25/2024 6:10 PM |
Date Last File Opened: | 4/25/2024 12:59 PM |
Date Last File Closed: | 4/25/2024 4:43 PM |
Last Observation Tag: | 3DD.0078C51CFD |
Last Observation Date: | 4/25/2024 2:58 PM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2024 | |||
2023 | 1/1/2023 12:00 AM | 1/1/2024 12:00 AM | Start and end dates based on timer tags. |
2022 | 1/1/2022 12:00 AM | 1/1/2023 12:00 AM | Start and end dates based on timer tags. |
2021 | 1/1/2021 12:00 AM | 1/1/2022 12:00 AM | Start and end dates based on timer tags. |
2020 | 1/1/2020 12:00 AM | 1/1/2021 12:00 AM | Start and end dates based on timer tags. See event logs for additional operational information. |
2019 | 1/11/2019 12:00 AM | 12/31/2019 12:00 AM | Start and end dates based on timer tags. |
2018 | 1/1/2018 12:00 AM | 1/1/2019 12:00 AM | Start and end dates based on file open and closed dates. File gap occurred April 4 - September 13. |
2017 | 1/1/2017 12:00 AM | 12/29/2017 12:00 AM | Start and end dates based on first/last timer tag detection dates. |
2016 | 1/1/2016 12:00 AM | 1/1/2017 12:00 AM | Start and end dates based on file open and close dates. |
2015 | 1/15/2015 12:00 AM | 1/1/2016 12:00 AM | Start and end dates based on file open and close dates. |
2014 | 2/11/2014 12:00 AM | 6/12/2014 12:00 AM | Start and end dates based on file open and close dates. |
2013 | 1/1/2013 12:00 AM | 3/22/2013 12:00 AM | Start and end dates based on file open and close dates. |
2012 | 1/1/2012 12:00 AM | 1/1/2013 12:00 AM | |
2011 | 11/1/2011 12:00 AM | 1/1/2012 12:00 AM | First year of operations. |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
Upstream Array | F0 | F1 |
Upstream Array | F0 | F2 |
Upstream Array | F0 | F3 |
Downstream Array | F0 | F4 |
Downstream Array | F0 | F5 |
Downstream Array | F0 | F6 |
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
No Photos
Event Log Summary
Event Date | Event Type | Comments |
---|---|---|
9/11/2020 1:23:00 PM | SiteUp | Power restored. |
9/6/2020 1:23:00 PM | SiteDown | Power down at site. |
8/5/2020 1:23:00 PM | SiteUp | Site re-installed after the flood of 2020. |
3/12/2020 3:17:50 PM | SiteDown | All antennas not working. Site will be down till summer. |
2/7/2020 7:12:00 AM | SiteDown | Antennas 1, 2, 3, 4, 5 are down due to flood waters. Antenna 6 still working. |
4/29/2019 10:00:00 AM | SiteUp | Power issues solved, site back up |
4/22/2019 6:00:00 AM | SiteDown | Site down, power issues |
6/6/2018 9:44:00 AM | General | On 6-06-18 all antennas were replaced with WDFW constructed HDPE 20' antennas. New IS1001 pods and cabling were installed. The QuBE reader was removed and replaced with an a MTS reader. All on shore equipment was placed in a new enclosure. |
6/20/2017 1:19:21 PM | General | • Bolles Bridge Touchet (BBT) – Site visit January 4th. Site monitored remotely. Antenna 1 & 2 are out on February 10th. Pulled thumb drive and found that it was nonfunctional. February 20th continued flood like river discharge has damaged or destroyed most of the site making any repair problematic at this time. June 19th repairs are ongoing and should be completed this summer. |