Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

Search by typing either a site name, site code, organization, or site type.

BHC - Bohannon Creek Lemhi R Basin

Status:   Active - Operations Unspecified
Site Type: Instream Remote Detection System  |  Organization: Biomark
General Operational Period: Year Round
Start Date: 12/6/2011 9:00 AM

In-stream detection system consisting of two 5ft x 3ft HDPE pipe antennas connected to standalone Bioamrk IS1001 readers. The site is located 40 m upstream of the confluence with the Lemhi River. The Bohannon Creek array site is located 0.3 km off of the Old Lemhi Road. The site is powered by AC and a battery switcher. Remote communication is provided by a 4G cellular modem. The site was originally installed in 2011 about half a kilometer upstream of its current location, to which it was relocated in 2013.

Current Operations

Last File Loaded: BHC-2021-297-P-00B.xml
Date Last File Loaded: 10/24/2021 8:50 AM
Date Last File Opened: 10/24/2021 3:59 AM
Date Last File Closed: 10/24/2021 6:59 AM
Last Observation Tag: 3DD.003D7FEE76
Last Observation Date: 10/15/2021 4:32 AM
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

Kyle Meier
kyle.meier@merck.com
208-275-0011

Data Steward:

Brett Turley
brett.turley@merck.com
208-841-2562

Location

Coordinates: 45.112189, -113.746897  |  River Km: 522.303.416.017.001

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2021
2020 1/1/2020 12:00 AM 1/1/2021 12:00 AM Start and end dates based on timer tags. See event logs for additional operational information.
2019 1/1/2019 12:00 AM 12/31/2019 12:00 AM Start and end dates based on timer tags.
2018 1/1/2018 12:00 AM 1/1/2019 12:00 AM Start and end dates based on file open and closed dates. Site updated to IS1001 readers in May.
2017 1/1/2017 12:00 AM 1/1/2018 12:00 AM Start and end dates based on file open and closed dates.
2016 1/1/2016 12:00 AM 1/1/2017 12:00 AM Start and end dates based on file open and closed dates.
2015 1/1/2015 12:00 AM 1/1/2016 12:00 AM Start and end dates based on file open and closed dates.
2014 1/29/2014 12:00 AM 1/1/2015 12:00 AM Start and end dates based on file open and closed dates.
2013 1/1/2013 12:00 AM 10/15/2013 12:00 AM Site shut down and moved downstream October 15.
2012 1/1/2012 12:00 AM 1/1/2013 12:00 AM
2011 12/6/2011 9:00 AM 1/1/2012 12:00 AM First year of operations.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  5/16/2018
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

Photos

Photos are contributed from stewards of the site.

Event Log Summary

Event Date Event Type Comments
3/6/2014 4:48:05 PM General Updated site configuration in PTAGIS
10/15/2013 9:00:00 AM General BHC PIT array site on Eagle Valley Ranch was shutdown and removed. New BHC array site was relocated downstream closer to mouth. However, new BHC array site is still in test stage as of 12/31/13. No new data is being uploaded to PTAGIS yet.

Archived Event Logs