Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

Search by typing either a site name, site code, organization, or site type.

BO3 - Bonneville WA Shore Ladder/AFF

Status:   Active - Operational
Site Type: Adult Fishway  |  Organization: Pacific States Marine Fisheries Commission
General Operational Period: Year Round
Start Date: 1/18/2003 6:00 AM

This site monitors the Washington Shore fish ladder and the adult fish facility (AFF). Antennas are installed in the weir orifices downstream and upstream of the AFF. There are also antennas installed in the two sample flumes in the AFF. Separation by Code is available at the AFF in the form of notification lights when designated PIT tags are detected in the sample flumes. Fish detected at BO3 and heading upstream are expected to be detected at BO4 afterwards.

Current Operations

Last File Loaded: BO3-2021-295-P-020.xml
Date Last File Loaded: 10/22/2021 9:21 PM
Date Last File Opened: 10/22/2021 7:06 PM
Date Last File Closed: 10/22/2021 8:06 PM
Last Observation Tag: 3D9.1BF233D4EE
Last Observation Date: 10/21/2021 11:41 PM
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

Don Warf
dlwarf@psmfc.org
509-735-2773

Data Steward:

Nicole Tancreto
ntancreto@psmfc.org
503-595-3100

Location

Coordinates: 45.649788, -121.936531  |  River Km: 234

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2021
2020 1/1/2020 12:00 AM 11/25/2020 12:00 AM
2019 2/22/2019 9:00 AM 1/1/2020 12:00 AM
2018 1/1/2018 12:00 AM 12/4/2018 9:00 AM
2017 2/27/2017 12:00 AM 1/1/2018 12:00 AM
2016 2/25/2016 12:00 AM 11/28/2016 12:00 AM
2015 2/25/2015 12:00 AM 1/1/2016 12:00 AM
2014 1/1/2014 12:00 AM 12/1/2014 12:00 AM
2013 2/26/2013 12:00 AM 1/1/2014 12:00 AM Lower portion of the ladder watered up on March 26.
2012 1/1/2012 12:00 AM 11/13/2012 8:00 AM The Washington shore ladder was moved to orifice flow on November 8 and dewatered on November 13.
2011 2/24/2011 3:00 PM 1/1/2012 12:00 AM The Washington Shore fishway was OOS from 03dec10-24feb11 for periodic maintenance.
2010 1/1/2010 12:00 AM 12/3/2010 9:30 AM The adult fish facility (AFF) was first activated on March 22 and was dewatered on 18 November. The Washington Shore and Cascades Island fish ladders went to orifice flow on 01 December, and were dewatered to tailwater at 9:30 AM on 03 December.
2009 1/1/2009 12:00 AM 1/1/2010 12:00 AM The Washington Shore ladder went to orifice flow on Jan. 10 and was dewatered for scheduled maintenance between January 12 and February 28. The Adult Fish Facility (AFF) first watered up on or around April 20; the AFF was dewatered for the year on November 9.
2008 1/1/2008 12:00 AM 1/1/2009 12:00 AM The adult fish facility (AFF) watered up on April 14.
2007 2/21/2007 9:00 AM 1/1/2008 12:00 AM The Washington Shore ladder was dewatered for maintenance from mid-December 2006 until February 21, 2007.
2006 1/1/2006 12:00 AM 12/11/2006 8:00 AM The Washington Shore ladder went to orifice flow at 0945h on December 9, 2006, and the AFF was dewatered. The ladder was dewatered at 8AM on December 11, 2006, for annual maintenance.
2005 2/28/2005 11:00 AM 1/1/2006 12:00 AM The BON Washington Shore ladder, which had been OOS since last November, watered-up on February 28, 2005.
2004 1/13/2004 4:00 PM 11/29/2004 8:30 AM The facility was dewatered for annual maintenance between December 8, 2003 and January 12, 2004. The Washington shore ladder was at orifice flow between Jan. 16 and 20 due to an oil slick in the forebay. The PIT Tag detectors were put in standby on Nov. 29 in preparation for ladder dewatering to install new slot antennas. The ladder will water up in February, 2005.
2003 1/18/2003 6:00 AM 12/8/2003 8:00 AM First year of BO3 site configuration, incorporating the Bonneville Washington shore ladder and Adult Fish Facility sites known previously as BWL and B2A, respectively. The site was dewatered (to orifice flow) at 8:00am on December 8, and fully dewatered on December 10, 2003, for annual maintenance.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  12/15/2003
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

Photos

Photos are contributed from stewards of the site.

Event Log Summary

This displays the last 25 events, to see the full history, log in to the Dashboard and go to Interrogation Site > Event Logs.

Event Date Event Type Comments
10/22/2021 7:27:35 AM ErrorsCleared
10/21/2021 7:40:26 AM ErrorsCleared
10/20/2021 7:15:25 AM ErrorsCleared
10/19/2021 7:25:10 AM ErrorsCleared
10/18/2021 7:41:30 AM ErrorsCleared
10/17/2021 10:48:03 AM ErrorsCleared Replace lithium batteries on next visit.
10/16/2021 10:44:14 AM ErrorsCleared Replace lithium batteries on next visit.
10/14/2021 7:27:22 AM ErrorsCleared Replace lithium batteries on next visit.
10/13/2021 8:43:40 AM ErrorsCleared Replace lithium batteries on next visit.
10/12/2021 8:50:51 AM ErrorsCleared Replace lithium batteries on next visit.
10/11/2021 9:34:23 AM ErrorsCleared Replace lithium batteries on next visit.
10/10/2021 7:59:55 AM ErrorsCleared Replace lithium batteries on next visit.
10/9/2021 7:52:36 AM ErrorsCleared Replace lithium batteries on next visit.
10/8/2021 7:06:29 AM ErrorsCleared
10/7/2021 7:07:39 AM ErrorsCleared Replace lithium batteries on next visit.
10/6/2021 7:24:45 AM ErrorsCleared
10/5/2021 7:19:22 AM ErrorsCleared Replace lithium batteries on next visit.
10/4/2021 8:06:51 AM ErrorsCleared Replace lithium batteries on next visit.
10/3/2021 8:41:52 AM ErrorsCleared Replace lithium batteries on next visit.
10/2/2021 8:11:13 AM ErrorsCleared Replace lithium batteries on next visit.
9/30/2021 9:15:58 AM ErrorsCleared Noted.
9/30/2021 9:15:47 AM ErrorsCleared Replace lithium batteries on next visit.
9/28/2021 10:14:39 AM ErrorsCleared
9/27/2021 7:56:46 AM ErrorsCleared Noted.
9/26/2021 10:33:35 AM ErrorsCleared Noted.