Interrogation Site Metadata
BPC - Bonaparte Creek Instream Array
Status: Active - OperationalGeneral Operational Period: Year Round
Start Date: 1/17/2013 12:00 AM
BPC is a permanent PIT Tag Interrogation System on Bonaparte Creek. Bonaparte Creek enters the Okanogan River at RKM 91.2, within the city of Tonasket, WA. The BPC site is located 0.08 km from the confluence with the Okanogan River. The site is on grid power and has remote communication abilities.
Current Operations
Last File Loaded: | BPC-2024-089-P-001.json |
Date Last File Loaded: | 3/29/2024 5:51 AM |
Date Last File Opened: | 3/29/2024 1:12 AM |
Date Last File Closed: | 3/29/2024 4:25 AM |
Last Observation Tag: | 3D9.1BF20A3278 |
Last Observation Date: | 3/29/2024 4:25 AM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2024 | |||
2023 | 1/1/2023 12:00 AM | 1/1/2024 12:00 AM | Start and end dates based on timer tags. |
2022 | 1/1/2022 12:00 AM | 12/14/2022 12:00 AM | Start and end dates based on timer tags. |
2021 | 1/1/2021 12:00 AM | 1/1/2022 12:00 AM | Start and end dates based on timer tags. |
2020 | 1/1/2020 12:00 AM | 1/1/2021 12:00 AM | Start and end dates based on timer tags. See event logs for additional operational information. |
2019 | 1/1/2019 12:00 AM | 12/31/2019 12:00 AM | Start and end dates based on timer tags. |
2018 | 1/1/2018 12:00 AM | 1/1/2019 12:00 AM | Start and end dates based on first/last timer tag detections. |
2017 | 1/1/2017 12:00 AM | 1/1/2018 12:00 AM | Start and end dates based on first/last timer tag detections. |
2016 | 1/1/2016 12:00 AM | 1/1/2017 12:00 AM | |
2015 | 1/1/2015 12:00 AM | 1/1/2016 12:00 AM | |
2014 | 1/1/2014 12:00 AM | 1/1/2015 12:00 AM | |
2013 | 1/17/2013 12:00 AM | 1/1/2014 12:00 AM | System down from September 9 - Novemeber 19. Antennas reinstalled in pass over configuration on November 19. |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
Three Antenna Series | C0 | C1 |
Three Antenna Series | C0 | C2 |
Three Antenna Series | C0 | C3 |
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
Photos
Event Log Summary
This displays the last 25 events, to see the full history, log in to the Event Logs.
Event Date | Event Type | Comments |
---|---|---|
1/31/2023 3:30:00 PM | General |
New modem installed. Site has resumed uploads. |
1/9/2023 11:30:00 AM | General |
Antenna 1 regained current. Damaged cable replaced. |
12/18/2022 1:45:00 PM | General |
Modem became faulty and is failing to connect to network. However, all PIT detection equipment is running fine. No data loss at this time. |
12/16/2022 12:30:00 PM | General |
Antenna 1 lost current due to severed cable caused by ice. |
8/8/2022 9:00:00 AM | SiteUp |
Reset GFCI at outlet, replaced fuse on battery switcher and swapped batteries. Site fully functional. |
8/5/2022 9:45:00 AM | SiteDown |
Site lost voltage due to GFCI reset at outlet. Site down. |
7/8/2020 10:46:00 AM | SiteUp | Antenna 1 back online, replaced pod. |
7/5/2020 1:46:00 PM | SiteDown | Antenna 1 lost current |
8/28/2019 12:30:00 PM | SiteUp | Site power back online. Upgraded from a MUX to an IS-1001 MTS-MC and installed 3 new IS-1001 reader boards. Removed old PVC antennas, drove new anchors and replaced with 3 new 10' HDPE antennas in pass-over orientation. Swapped out old 12V batteries for new ones and replaced battery switcher. |
6/24/2019 10:30:00 AM | SiteDown | Site was taken offline temporarily. Power to the building where the site is plugged into was shut off to perform building maintenance. Estimated time for power and reinstall is 2-3 weeks. |
8/10/2016 10:30:00 AM | SiteUp | Add new switcher and reset MUX and retune antennas. System operational. |
8/4/2016 8:00:00 AM | SiteDown | Switcher issues continue. System off until new switcher is availble. |
8/3/2016 8:45:00 AM | SiteDown | Redo entire jobox. System download and off at 900. Switcher not funtioning. System off. |
7/20/2016 12:00:00 PM | General | Check volts on battery banks and PS100 before and after switching. Possible bad battery. |
6/19/2016 2:15:00 PM | SiteUp | System on. Swap in new switcher. PS100 battery low. Needs replaced or recharged. |
6/19/2016 7:15:00 AM | SiteUp | System on. Switcher only working on one side. Needs replaced. |
6/18/2016 9:00:00 AM | SiteDown | System off. Low volts from switcher and PS100 |
6/13/2016 9:00:00 AM | General | Change coin cell in MUX and reset parameters |
5/11/2016 10:00:00 AM | General | Unknown increased noise levels |
11/9/2015 12:30:00 PM | General | Move antenna 1, 7m downstream due to undercutting at current location |
8/10/2015 12:15:00 PM | General | High noise antenna 3. Retune and secure rocks around antenna 3. |
5/11/2015 12:00:00 PM | General | Retune antennas. High noise issues. Low water and antennas exposed. |
7/31/2014 11:00:00 AM | General | Tune all antennas and check modem. |
6/18/2014 9:00:00 AM | General | Install security camera and signs at site. |
6/2/2014 1:00:00 PM | General | Reset MUX. Date/time off. Battery banks ~26v/25v. |