Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

BRC - Bear Valley Adult Video Weir

Status:   Active - Operational
Site Type: Instream Remote Detection System  |  Organization: Shoshone-Bannock Tribes
General Operational Period: Seasonally
Start Date: 6/18/2014 12:00 AM

On June 28, 2012, the Tribes, with assistance from Biomark, installed a pass-through interrogation system on the existing Bear Valley Creek Chinook adult monitoring weir to evaluate the returns of PIT tagged adults to Bear Valley Creek, Idaho. The interrogation site consists of two 24 x 24 inch Biomark pass-through antennas attached to the video chamber box, separated by six feet to provide upstream and downstream detection capability. The antenna cables are woven across the weir panels to the central mux, located in a weather resistant, insulated and fan cooled cargo trailer adjacent to the weir. Power is supplied by four tandem 50 amp-hour 12 volt DC batteries under constant charge from the on-site camp trailer generator. The in-stream location is characterized as a B-type channel with 2-4 percent grade, a B-type streambed, and a 2-3 (boulder:cobble) steam type.

Current Operations

Last File Loaded: BRC-2023-234-P-001.json
Date Last File Loaded: 11/13/2023 12:10 PM
Date Last File Opened: 8/22/2023 6:34 PM
Date Last File Closed: 9/12/2023 12:23 PM
Last Observation Tag: 3DD.003D80213B
Last Observation Date: 9/12/2023 12:23 PM
Detection Summary: Last Day's Observations

Contacts

Data Steward:

Kurt Tardy
ktardy@sbtribes.com
208-239-4562

Location

Coordinates: 44.427939, -115.284171  |  River Km: 522.303.319.170.006

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023 8/22/2023 12:00 AM 9/13/2023 12:00 AM Start and end dates based on timer tags.
2022 7/6/2022 12:00 AM 8/28/2022 12:00 AM Start and end dates based on timer tags.
2021 6/16/2021 12:00 AM 9/1/2021 12:00 AM Start and end dates based on timer tags.
2020 6/28/2020 12:00 AM 9/14/2020 12:00 AM Start and end dates based on timer tags. See event logs for additional operational information.
2019 6/25/2019 12:00 AM 9/9/2019 12:00 AM Start and end dates based on timer tags.
2018 6/20/2018 12:00 AM 9/7/2018 5:00 PM
2017 7/12/2017 12:00 AM 8/23/2017 12:00 AM
2016 6/14/2016 12:00 AM 9/11/2016 12:00 AM
2015 6/3/2015 12:00 AM 9/15/2015 12:00 AM
2014 6/18/2014 12:00 AM 9/11/2014 12:00 AM
2013 No data received for 2013.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  6/28/2012
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

Event Date Event Type Comments
1/15/2021 8:46:55 AM General Operational dates in 2020 were from 6/18/2020 to 9/13/2020. During this period, there were no interruptions in operations.
12/13/2018 8:19:24 AM SiteUp Operational dates in 2018 were from 6/20/2018 to 9/7/2018. During this period, there were no interruptions in operations.
2/13/2018 10:17:31 AM General Operational dates in 2017 were from 7/12/2017 to 8/23/2017. During this period, there were no interruptions in operations.
8/1/2017 9:00:00 AM SiteDown Site down and not operational from 8/1/2017 - 8/15/2017 because of upgrade to power supply systems.
1/20/2017 9:14:21 AM General Operational dates in 2015 were from 6/3/2015 to 9/15/2015. During this period, there were no interruptions in operations.
1/20/2017 9:14:21 AM General Operational dates in 2016 were from 6/14/2016 to 9/11/2016. During this period, there were no interruptions in operations.
3/24/2015 1:25:04 PM General Operational dates in 2014 were from 6/18/2014 to 9/11/2014.  During this period, there were no interruptions in operations.
3/24/2015 1:25:04 PM General Operational dates in 2014 were from 6/18/2014 to 9/11/2014.  During this period, there were no interruptions in operations.
3/24/2015 1:25:04 PM General Operational dates in 2014 were from 6/18/2014 to 9/11/2014.  During this period, there were no interruptions in operations.
2/21/2014 12:00:06 PM General Operational dates in 2013 were from 6/12/2013 to 9/9/2013.

No Archived Event Logs