Interrogation Site Metadata
BSH - Big Sheep Crk. Upper Columbia
Status: Active - OperationalGeneral Operational Period: Year Round
Start Date: 2/11/2015 12:00 AM
The detection system consists of 2 antennas, installed in a pass-over loop configuration approximately 170 feet apart. Each half duplex antenna spans the width of the channel which is approximately 80 feet and is operated by a Single-Antenna HDX Reader (Oregon RFID). This site is configured to detect half-duplex tags only. Data from the antennas is stored in the internal memory and is uploaded to PTAGIS on a monthly basis. A 24V DC battery bank connected to solar panel powers the detection system. The antennas were built and installed by WDFW staff. The site is operated year round.
Current Operations
Last File Loaded: | BSH-2022-168-P-ALL.xml |
Date Last File Loaded: | 6/18/2022 1:40 PM |
Date Last File Opened: | 6/9/2022 12:14 PM |
Date Last File Closed: | 6/17/2022 10:06 AM |
Last Observation Tag: | 384.349EB575E0 |
Last Observation Date: | 6/17/2022 9:24 AM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2022 | |||
2021 | 1/1/2021 12:00 AM | 12/29/2021 9:52 AM | Start and end dates based on file open and closed dates. |
2020 | 1/1/2020 12:00 AM | 12/28/2020 9:46 AM | Start and end dates based on file open and close dates. |
2019 | 1/1/2019 12:00 AM | 1/1/2020 12:00 AM | Start and end dates based on file open and close dates. |
2018 | 1/2/2018 12:00 AM | 12/29/2018 12:00 AM | Start and end dates based on first/last timer tag detections. |
2017 | 1/3/2017 12:00 AM | 12/27/2017 12:00 AM | Start and end dates based on first/last timer tag detections. |
2016 | 1/4/2016 12:00 AM | 12/28/2016 12:00 AM | Start and end dates based on first/last timer tag detections. |
2015 | 2/11/2015 12:00 AM | 1/1/2016 12:00 AM | Start and end dates based on first/last timer tag detections. |
2014 | No data received. | ||
2013 | No data received. | ||
2012 | No data received. | ||
2011 | No data received. |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
Upstream Antenna | 01 | 01 |
Downstream Antenna | 02 | 02 |
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
No Photos
Event Log Summary
This displays the last 25 events, to see the full history, log in to the Dashboard and go to Interrogation Site > Event Logs.
Event Date | Event Type | Comments |
---|---|---|
6/17/2022 11:15:00 AM | General |
Site visited. Data downloaded, batteries replaced, and tuning checked. Site fully operational. |
6/9/2022 1:15:00 PM | General |
Site visited. Data downloaded and tuning checked. Site fully operational. |
6/3/2022 12:25:00 PM | General |
Site visited. Data downloaded, batteries replaced, and tuning checked. Site fully operational. |
5/27/2022 11:40:00 AM | General |
Site visited. Data downloaded, batteries replaced, and tuning checked. Site fully operational. |
5/20/2022 11:50:00 AM | General |
Site visited. Data downloaded, batteries replaced, and tuning checked. Site fully operational. |
5/13/2022 3:05:00 PM | General |
Site visited. Data downloaded and tuning checked. Site fully operational. |
5/7/2022 11:30:00 AM | General |
Site visited. Data downloaded, batteries replaced, and tuning checked. Site fully operational. |
4/30/2022 2:40:00 PM | General |
Site visited. Data downloaded, batteries replaced, and tuning checked. Site fully operational. |
4/22/2022 10:45:00 AM | General |
Site visited. Data downloaded, batteries replaced, and tuning checked. Site fully operational. |
4/16/2022 10:15:00 AM | General |
Site visited. Data downloaded, batteries replaced, and tuning checked. Site fully operational. |
4/8/2022 11:21:00 AM | General |
Site visited. Data downloaded, batteries replaced, and tuning checked. Site fully operational. |
4/6/2022 8:40:00 AM | General |
Site visited. Data downloaded and tuning checked. Site fully operational. |
4/4/2022 10:20:00 AM | General |
Site visited. Data downloaded, batteries replaced, and tuning checked. Site fully operational. |
3/26/2022 9:15:00 AM | General |
Site visited. Data downloaded, batteries replaced, and tuning checked. Site fully operational. |
3/18/2022 9:45:00 AM | General |
Site visited. Data downloaded, batteries replaced, and tuning checked. Site fully operational. |
3/13/2022 10:45:00 AM | General |
Site visited. Data downloaded, batteries replaced, and tuning checked. Site fully operational. |
3/4/2022 8:30:00 AM | General |
Site visited. Data downloaded, batteries replaced, and tuning checked. Downstream antenna has a loose wire and could have affected detection efficiency for an extended period of time. Issue has been resolved and site now fully operational. |
2/26/2022 8:20:00 AM | General |
Site visited. Data downloaded, batteries replaced, and tuning checked. Site fully operational. |
2/18/2022 9:15:00 AM | General |
Site visited. Data downloaded, batteries replaced, and tuning checked. Site fully operational. |
2/13/2022 8:50:00 AM | General |
Site visited. Data downloaded, batteries replaced, and tuning checked. Site fully operational. |
2/3/2022 2:01:00 PM | General |
Site visited. Data downloaded, batteries replaced, and tuning checked. Site fully operational. |
1/29/2022 9:15:00 AM | General |
Site visited. Data downloaded, batteries replaced, and tuning checked at both antennas. Site is fully operational. |
1/29/2022 8:57:00 AM | General |
Upstream antenna is now operating. Batteries charged enough to make voltage adequate enough to operate temporarily. Site is now fully operational. |
1/29/2022 5:07:00 AM | General |
Upstream antenna went down due low voltage. Issue will be resolved in the near future. Downstream antenna is still operational. |
1/22/2022 9:09:00 AM | General |
Upstream antenna is now operating. Batteries replaced. Site is now fully operational. |