Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

BVP - Beaver Creek Acclimation Pond

Status:   Decommissioned
Site Type: Monitored Fish Release  |  Organization: Yakama Nation
General Operational Period: Seasonally
Start Date: 3/23/2006 12:00 AM
End Date: 7/27/2022 12:00 AM

Beaver Creek Acclimation Pond, Wenatchee River Basin Site.

Contacts

Primary Contact:

Tim Jeffris
jeft@yakamafish-nsn.gov
509-548-9413 x110

Data Steward:

Jeffrey Caisman
caij@yakamafish-nsn.gov

Location

Coordinates: 47.768224, -120.648222  |  River Km: 754.075.001

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2022 4/4/2022 12:00 AM 7/27/2022 12:00 AM Start and end dates based on file open and closed dates.
2021 No data received for 2021
2020 No data received this year
2019 3/25/2019 11:00 PM 6/4/2019 11:00 PM Start and end dates based on file open and close dates.
2018 5/5/2018 12:00 AM 7/2/2018 12:00 AM Start and end dates based on file created and closed dates.
2017 3/16/2017 12:00 AM 7/10/2017 12:00 AM Start and end dates based on file created and closed dates.
2016 3/31/2016 12:00 AM 7/2/2016 12:00 AM Start and end dates based on file created and closed dates.
2015 3/22/2015 12:00 AM 6/25/2015 12:00 AM
2014 3/24/2014 12:00 AM 6/26/2014 12:00 AM
2013
2012 3/9/2012 12:00 AM 8/1/2012 12:00 AM Antenna A0 was installed on March 9. Juvenile coho were transferred to the pond on March 12. Volitional release ran from March 12 - August 1. Antenna B0 was installed on March 16. Both antennas were removed on August 1.
2011 3/29/2011 2:30 PM 7/14/2011 12:00 AM Fish transported to pond on March 30. Antennas 2 and 3 removed on March 31 due to high water. Antenna 1 was installed in pond on April 12. Antennas 2 and 3 were reinstalled on May 10 and removed again on May 17. It was reinstalled on May 18.
2010 No monitored release activity at Beaver Creek Pond in 2010.
2009 There were no monitored releases from Beaver Creek Pond in 2009.
2008 There were no monitored releases from Beaver Creek Pond in 2008.
2007 4/1/2007 12:00 AM 6/25/2007 12:00 AM
2006 3/23/2006 12:00 AM 6/29/2006 12:00 AM

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  1/1/2007
End Date:  7/27/2022

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

Event Date Event Type Comments
6/25/2015 8:00:00 PM SiteDown BVP taken down at completion of volitional release.
3/22/2015 8:00:00 AM SiteUp BVP site up for acclimation season.
6/26/2014 8:00:00 PM SiteDown Site taken down at completion of volitional release.
3/24/2014 8:00:00 AM SiteUp Site up for acclimation season.

Archived Event Logs