Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

CAP - Carlton Acc. Pond

Status:   Decommissioned
Site Type: Monitored Fish Release  |  Organization: Washington Dept. of Fish and Wildlife
General Operational Period: Seasonally
Start Date: 4/24/1995 11:08 AM
End Date: 5/10/1995 6:06 PM

Originally only active for one year in 1995. In 2014 an eight tank volition release pond system was constructed to replace the single acclimation pond and the site was reactivated. The QST QuBE and two RM-310s are housed in an enclosure outside near the southeast end of the now disused fish pond. The antennas are coils around a PVC pipe with aluminum shields located in the fish release pipe vault. Data was never submitted from the site in this new configuration and the site was decommissioned in 2018.

Contacts

Data Steward:

Eric Lauver
elauver@gcpud.org
509-797-5175

Location

Coordinates: 48.343361, -120.088760  |  River Km: 843.058

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2014 No data received from this site for 2014.
1995 4/24/1995 11:08 AM 5/10/1995 6:06 PM The Start_date and End_date values reflect the first and last dates of detection, respectively. The actual interval of operational dates is not known.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  4/8/2014
End Date:  5/8/2014

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

Photos


Event Log Summary

Event Date Event Type Comments
5/21/2015 4:48:55 PM General Updated configuration and reactivated interrogation site CAP.
5/13/2015 10:00:00 PM SiteDown Site down
4/13/2015 8:00:00 AM SiteUp Site up
4/29/2014 10:00:00 PM SiteUp Site down
4/29/2014 10:00:00 PM SiteDown Site down
4/7/2014 8:00:00 AM SiteUp Site up

No Archived Event Logs