Interrogation Site Metadata

CDP - Cushman Dam Project

Status:   Active - Non-Operational
Site Type: Juvenile Fish Bypass Facility  |  Organization: Tacoma Public Utilities
General Operational Period: Seasonally
Start Date: 5/14/2015 12:00 AM

The Cushman Hydroelectric Project consists of two high-head dams on the North Fork Skokomish River. Cushman Dam #1 is the upstream most dam and impounds Lake Cushman. Cushman Dam #2 is about two miles downstream and impounds Lake Kokanee. Initial configuration included 2 sets of PIT tag readers: one associated with a juvenile fish passage floating surface collector at Cushman Dam #1 and one in the Cushman Dam fish facility at Cushman Dam #2 following fish handling. In 2017, two antennas were installed in the net transition structure upstream of the floating surface collector. Out migrating smolts are collected at the floating surface collector and transported to the fish facilities from where they are released downstream of Cushman Dam #2. There is no fish passage between the two dams other than through the floating surface collector at Cushman Dam #1. Returning adults are also scanned at the fish facility at Cushman Dam #2.

Current Operations

Last File Loaded: CDP-2024-117-P-013.json
Date Last File Loaded: 4/26/2024 12:20 PM
Date Last File Opened: 4/26/2024 10:23 AM
Date Last File Closed: 4/26/2024 10:30 AM
Last Observation Tag: 3DD.003D89D0A4
Last Observation Date: 4/26/2024 5:04 AM
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

Matt Peter
mpeter@cityoftacoma.org
253-208-2814

Data Steward:

Scott Gibson
SGibson@ci.tacoma.wa.us
253-779-7535

Location

Coordinates: 47.397547, -123.201129  |  River Km: ***

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023 1/1/2023 12:00 AM 1/1/2024 12:00 AM Start and end dates based on timer tags.
2022 1/1/2022 12:00 AM 1/1/2023 12:00 AM Start and end dates based on timer tags.
2021 1/1/2021 12:00 AM 1/1/2022 12:00 AM Start and end dates based on timer tags.
2020 1/1/2020 12:00 AM 1/1/2021 12:00 AM Start and end dates based on timer tags. See event logs for additional operational information.
2019 1/1/2019 12:00 AM 12/31/2019 12:00 AM Start and end dates based on timer tags.
2018 1/1/2018 12:00 AM 1/1/2019 12:00 AM Start and end dates based on timer tags.
2017 3/22/2017 12:00 AM 1/1/2018 12:00 AM End date based on timer tags.
2016 4/11/2016 12:00 AM 8/3/2016 12:00 AM
2015 5/14/2015 12:00 AM 7/8/2015 12:00 AM

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  5/22/2020
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

Event Date Event Type Comments
7/31/2020 9:01:00 AM SiteDown Site shut down at end of 2020 season: 7/31/2020 9:01 AM PST.
3/13/2020 12:43:00 PM SiteUp Site start up at opening of 2020 season: 3/13/2020 12:43 PM PST.
7/26/2019 10:00:00 AM SiteDown Site shut down at end of 2019 season.
3/15/2019 11:35:00 AM SiteUp Site start up at opening of 2019 season.
7/31/2018 8:57:00 AM SiteDown Site shut down at end of 2018 season.
11/13/2017 8:03:01 AM General I resubmitted file CDP17315.00H.
3/23/2017 3:16:49 PM General I changed the VTT detection delay to 60 minutes.
3/23/2017 12:08:35 PM General Antennas A1 and A2 were installed and went on line on 3/22/17. I changed the reader clocks to reflect the correct time on 3/23/17. I set up data collection to occur once an hour at least temporarily while the system is being tested.- Brett Turley, Biomark, Inc.
3/22/2017 12:00:00 AM SiteUp FSC begins operational state, Atennas A1, A2, 01 online.
4/27/2015 4:07:06 PM General Registered new interrogation site for Cushman Dam Project. This site is in the Puget Sound region on the North Fork Skokomish River.

No Archived Event Logs