Interrogation Site Metadata
CDP - Cushman Dam Project
Status: Active - Non-OperationalGeneral Operational Period: Seasonally
Start Date: 5/14/2015 12:00 AM
The Cushman Hydroelectric Project consists of two high-head dams on the North Fork Skokomish River. Cushman Dam #1 is the upstream most dam and impounds Lake Cushman. Cushman Dam #2 is about two miles downstream and impounds Lake Kokanee. Initial configuration included 2 sets of PIT tag readers: one associated with a juvenile fish passage floating surface collector at Cushman Dam #1 and one in the Cushman Dam fish facility at Cushman Dam #2 following fish handling. In 2017, two antennas were installed in the net transition structure upstream of the floating surface collector. Out migrating smolts are collected at the floating surface collector and transported to the fish facilities from where they are released downstream of Cushman Dam #2. There is no fish passage between the two dams other than through the floating surface collector at Cushman Dam #1. Returning adults are also scanned at the fish facility at Cushman Dam #2.
Current Operations
Last File Loaded: | CDP-2024-117-P-013.json |
Date Last File Loaded: | 4/26/2024 12:20 PM |
Date Last File Opened: | 4/26/2024 10:23 AM |
Date Last File Closed: | 4/26/2024 10:30 AM |
Last Observation Tag: | 3DD.003D89D0A4 |
Last Observation Date: | 4/26/2024 5:04 AM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2024 | |||
2023 | 1/1/2023 12:00 AM | 1/1/2024 12:00 AM | Start and end dates based on timer tags. |
2022 | 1/1/2022 12:00 AM | 1/1/2023 12:00 AM | Start and end dates based on timer tags. |
2021 | 1/1/2021 12:00 AM | 1/1/2022 12:00 AM | Start and end dates based on timer tags. |
2020 | 1/1/2020 12:00 AM | 1/1/2021 12:00 AM | Start and end dates based on timer tags. See event logs for additional operational information. |
2019 | 1/1/2019 12:00 AM | 12/31/2019 12:00 AM | Start and end dates based on timer tags. |
2018 | 1/1/2018 12:00 AM | 1/1/2019 12:00 AM | Start and end dates based on timer tags. |
2017 | 3/22/2017 12:00 AM | 1/1/2018 12:00 AM | End date based on timer tags. |
2016 | 4/11/2016 12:00 AM | 8/3/2016 12:00 AM | |
2015 | 5/14/2015 12:00 AM | 7/8/2015 12:00 AM |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
Net Transition Structure | A1 | A1 |
Net Transition Structure | A2 | A2 |
Floating Surface Collector | 01 | 01 |
Fish Facility | 03 | 03 |
Fish Facility | 04 | 04 |
Fish Facility | 05 | 05 |
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
No Photos
Event Log Summary
Event Date | Event Type | Comments |
---|---|---|
7/31/2020 9:01:00 AM | SiteDown | Site shut down at end of 2020 season: 7/31/2020 9:01 AM PST. |
3/13/2020 12:43:00 PM | SiteUp | Site start up at opening of 2020 season: 3/13/2020 12:43 PM PST. |
7/26/2019 10:00:00 AM | SiteDown | Site shut down at end of 2019 season. |
3/15/2019 11:35:00 AM | SiteUp | Site start up at opening of 2019 season. |
7/31/2018 8:57:00 AM | SiteDown | Site shut down at end of 2018 season. |
11/13/2017 8:03:01 AM | General | I resubmitted file CDP17315.00H. |
3/23/2017 3:16:49 PM | General | I changed the VTT detection delay to 60 minutes. |
3/23/2017 12:08:35 PM | General | Antennas A1 and A2 were installed and went on line on 3/22/17. I changed the reader clocks to reflect the correct time on 3/23/17. I set up data collection to occur once an hour at least temporarily while the system is being tested.- Brett Turley, Biomark, Inc. |
3/22/2017 12:00:00 AM | SiteUp | FSC begins operational state, Atennas A1, A2, 01 online. |
4/27/2015 4:07:06 PM | General | Registered new interrogation site for Cushman Dam Project. This site is in the Puget Sound region on the North Fork Skokomish River. |