Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

CLP - Coulter Creek Acclimation Pond

Status:   Active - Operational
Site Type: Monitored Fish Release  |  Organization: Yakama Nation
General Operational Period: Seasonally
Start Date: 4/4/2006 12:00 AM

Coulter Creek Acclimation Pond, Wenatchee River Basin

Current Operations

Last File Loaded: CLP-2023-103-P-001.json
Date Last File Loaded: 7/24/2023 2:31 PM
Date Last File Opened: 4/13/2023 10:07 AM
Date Last File Closed: 5/24/2023 8:25 AM
Last Observation Tag: 3DD.003DF70D0B
Last Observation Date: 5/24/2023 8:25 AM
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

Tim Jeffris
jeft@yakamafish-nsn.gov
509-548-9413 x110

Data Steward:

Jeffrey Caisman
caij@yakamafish-nsn.gov

Location

Coordinates: 47.764530, -120.803000  |  River Km: 754.089.014.001

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023 4/13/2023 12:00 AM 4/14/2023 12:00 AM Start and end dates based on timer tags.
2022 No 2022 data received for this site.
2021 No data received for 2021
2020 3/20/2020 5:00 AM 6/30/2020 11:00 AM Start and end dates based on file open and close dates.
2019 No tagged fish were released from this location in 2019 so the interrogation site did not operate.
2018 4/26/2018 12:00 AM 7/2/2018 12:00 AM Start and end dates based on file open and close dates.
2017 No data received.
2016 2/25/2016 12:00 AM 6/10/2016 12:00 AM Start and end dates based on file open and close dates.
2015 Site did not operate.
2014 4/4/2014 12:00 AM 6/23/2014 12:00 AM
2013 3/29/2013 12:00 AM 6/13/2013 12:00 AM Start and end dates based on file open and close dates.
2012 4/12/2012 12:00 AM 6/15/2012 12:00 AM Antenna A0 was installed April 12, B0 was installed May 2. Juvenile coho delivered to pond on April 13. Volitional release ran from May 14 - June 15. Both antennas were removed June 15.
2011 This site was not operational during 2011.
2010 No monitored release activity at Coulter Creek Pond in 2010.
2009 There were no monitored releases from Coulter Creek Pond in 2009.
2008 There were no monitored releases from Coulter Creek Pond during 2008.
2007 4/1/2007 12:00 AM 6/25/2007 12:00 AM Detection systems were in place at Coulter pond on 4/1/07. Release and first detection did not occur until 4/27/07. Detection activity concluded on 6/25/07. Contact Christa Strickwerda (christa@mid-columbia-coho.net) for more information.
2006 4/4/2006 12:00 AM 6/19/2006 12:00 AM Contact Christa Strickwerda (christa@mid-columbia-coho.net) for information regarding the 2006 monitored release from Coulter Creek Pond.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  1/1/2006
End Date:  ----

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

Event Date Event Type Comments
4/13/2023 12:00:00 AM SiteUp Coho release 2023
4/13/2023 12:00:00 AM SiteUp coho release 2023
4/13/2023 12:00:00 AM SiteUp coho release 2023
7/14/2015 11:17:00 AM General CLP interrogation units were not used in 2015.
6/26/2015 8:00:00 PM General CLP was not monitored in 2015.

Archived Event Logs