COP is a permanent instream PIT tag interrogation site at RKM 0.8 on Coppei Creek. The site consists of two rows of antennas, with each row spanning the wetted width of the channel during base flows. Each row consists of one 20-foot PVC antenna, installed in flat-plate configuration. Each antenna is powered by a Biomark IS1001 Master Controller, which replaced a QST QuBE in May 2021. The antennas were built and installed by WDFW. A cellular modem is installed on site to provide remote communication and allow for automated data collection. The electrical power at the site is provided by a local landowner with a 110 electrical outlet. Data currently will be downloaded by Biomark through a cell modem. No environmental monitors are installed at this time.
Current Operations
Last File Loaded: | COP-2024-115-P-003.json |
Date Last File Loaded: | 4/25/2024 4:30 AM |
Date Last File Opened: | 4/24/2024 9:41 AM |
Date Last File Closed: | 4/24/2024 11:13 PM |
Last Observation Tag: | 3DD.0078C51ED4 |
Last Observation Date: | 4/22/2024 4:47 AM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2024 | |||
2023 | 1/1/2023 12:00 AM | 1/1/2024 12:00 AM | Start and end dates based on timer tags. |
2022 | 1/1/2022 12:00 AM | 1/1/2023 12:00 AM | Start and end dates based on timer tags. |
2021 | 5/26/2021 12:00 AM | 1/1/2022 12:00 AM | Start and end dates based on timer tags. |
2020 | 1/1/2020 12:00 AM | 5/20/2020 8:07 AM | Start and end dates based on file open and close dates. |
2019 | 1/1/2019 12:00 AM | 1/1/2020 12:00 AM | Start and end dates based on file open and close dates. |
2018 | 1/1/2018 12:00 AM | 1/1/2019 12:00 AM | Start and end dates based on file open and close dates. File gap June 1-10. File gap June 14 - December 23. |
2017 | 1/1/2017 12:00 AM | 1/1/2018 12:00 AM | Start and end dates based on file open and close dates. File gap June 17 - December 29. |
2016 | 1/1/2016 12:00 AM | 1/1/2017 12:00 AM | Start and end dates based on file open and close dates. |
2015 | 12/11/2015 12:00 AM | 1/1/2016 12:00 AM | Start and end dates based on file open and close dates. |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
Upstream Array | 01 | 01 |
Downstream Array | 01 | 02 |
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
No Photos
Event Log Summary
Event Date | Event Type | Comments |
---|---|---|
11/15/2023 11:00:00 AM | SiteUp |
Started the site up for the season. |
7/10/2023 12:00:00 PM | SiteDown |
Site turned off for the summer due to creek dried up. |
11/18/2022 9:00:00 AM | SiteUp |
Started up the site. |
8/4/2022 10:00:00 AM | SiteDown |
Site turned off for the summer due to no flow in the creek. |
10/24/2021 8:00:00 AM | SiteUp |
Site turned back on. |
6/8/2021 2:51:02 PM | SiteDown | Site is offline for the summer due to low flows. |
5/26/2021 2:00:00 PM | SiteUp | Changed site from a QuBE to a Master Controller. |
7/15/2020 10:00:00 AM | General | Turned site off for the summer due to no flow in stream |
10/28/2019 9:00:00 AM | SiteUp | Site restarted for the season. |
7/9/2019 11:00:00 AM | SiteDown | Site is off for the summer due to no/low stream flows. Site will be back up in the late fall when flows allow. |
6/20/2017 1:19:21 PM | General | • Coppei Creek (COP) – Site visit January 4th. Removed failing POD. Site monitored remotely. June 19th any repairs needed are ongoing and should be completed this summer. |
10/15/2015 4:55:02 PM | General | Registered new interrogation site COP - Lower Coppei Instream Array. |