Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

CWP - Chewuch Acclimation Pond

Status:   Active - Non-Operational
Site Type: Monitored Fish Release  |  Organization: Yakama Nation
General Operational Period: Seasonally
Start Date: 4/16/2015 12:00 AM

The pond is a man-made, remote acclimation pond located approximatley 6 miles north of Winthrop on Boulder Creek Rd., off the the East Chewuch Rd. Acclimation of juvenile salmon at this site will occur on a yearly basis and between March 1 and June 15, depending on species. The interrogation site is comprised of three AllFlex detection systems installed in series; two within the infrastructure at back of the pond and one in the outlet to the Chewuch River. The systems are installed prior to release and are taken out when all fish have left the facility.

Current Operations

Last File Loaded: CWP-2023-097-P-001.json
Date Last File Loaded: 6/5/2023 10:21 AM
Date Last File Opened: 4/7/2023 5:25 AM
Date Last File Closed: 5/13/2023 7:37 AM
Last Observation Tag: 3DD.003E3F6BFD
Last Observation Date: 5/13/2023 7:37 AM
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

Katie Weber
webk@yakamafish-nsn.gov
253-376-3777

Data Steward:

Danielle Grundy
grund@yakamafish-nsn.gov

Location

Coordinates: 48.565110, -120.176618  |  River Km: 843.080.010

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023 4/7/2023 5:25 AM 5/13/2023 7:37 AM Start and end dates based on file open and closed dates.
2022 4/23/2022 10:49 AM 5/19/2022 12:31 PM Start and end dates based on file open and closed dates.
2021 3/16/2021 12:00 AM 5/5/2021 12:00 AM Start and end dates based on timer tags.
2020 3/24/2020 12:00 AM 4/25/2020 12:00 AM Start and end dates based on timer tags. See event logs for additional operational information.
2019 4/23/2019 12:00 AM 5/2/2019 12:00 AM Start and end dates based on timer tags.
2018 Site was not in operation this year.
2017 Site was not in operation this year.
2016 4/21/2016 11:40 AM 4/29/2016 9:10 AM
2015 4/16/2015 12:00 AM 4/27/2015 12:00 AM

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  3/15/2023
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

Photos


Event Log Summary

Event Date Event Type Comments
6/21/2023 5:00:00 PM General

2023 Interrogation event log for the Chewuch Acclimation Pond (CWP) Configuration 110

PIT tag interrogation (Antenna 01) for Chewuch Acclimation Pond was installed on 04-06-2023 and removed on 05-13-2023. Antenna (01) was located at the pond outlet opening in the outlet channel.

PIT tag interrogation (Antenna 02) for Chewuch Acclimation Pond was installed on 04-06-2023 and removed on 05-13-2023. Antenna 02 was located 2 meters downstream of the outlet.

PIT tag interrogation (Antenna 03) for Chewuch Acclimation Pond was installed on 04-06-2023 and removed on 05-13-2023. Antenna B1 was located 3 meters downstream of the outlet.

Antenna (01), Antenna (02), and Antenna (03) downloads were combined into a single interrogation file.

6/13/2022 4:23:00 PM General

Interrogation event log for the Chewuch Acclimation Pond (CWP) - 2022 Release

PIT tag interrogation system (Antenna 02) for Chewuch River Acclimation Pond began on 04-25-2022 at 0800 hrs. Antenna (02) is located in chamber two of the pond outlet structure. Antenna (02) was never moved and did not experience any lapse in coverage. The last download for this antenna occurred on 05-04-2022 at 1110 hrs.

PIT tag interrogation system (Antenna 03) for the Chewuch Acclimation Pond began on 04-23-2022 at 1040 hrs. Antenna (03) is located in the Chewuch River at the pond's outlet. Antenna (03) was never moved and did not experience any lapse in coverage. The last download for this antenna occurred on 05-19-2022 at 1240 hrs. after the interrogation period.

The Chewuch Acclimation Pond was de-watered on 05-04-2022.

Antenna (02) and Antenna (03) downloads were combined into a single interrogation file.

7/14/2021 10:46:00 AM General

Interrogation event log for the Chewuch Acclimation Pond (CWP) - 2021 release

IS1001 PIT tag interrogation systems (Antenna 01-03) for the Chewuch Acclimation Pond began on 03-16-2021 at 1030 hrs.  Three antenna’s (01, 02, 03) were located at the outlet of the pond, respectfully. These antennas were never moved. This site experienced a lapse in coverage due to system error. All useable detections were obtained after 04-16-2021 until end of the interrogation event. A single file was downloaded on 05-04-2021 at 1740 hrs at the conclusion of the interrogation period.

The Chewuch Acclimation Pond was de-watered on 04-29-2021, but the arrays were left in the outlet channel for 5 days after the end of release.

6/30/2020 1:18:07 PM SiteDown Interrogation event log for the Chewuch Acclimation Pond (CWP) - 2020 release IS1001 PIT tag interrogation systems (Antenna 01-03) for the Chewuch Acclimation Pond began on 03-24-2020 at 1130 hrs. Three antenna’s (01, 02, 03) were located at the outlet of the pond, respectfully. These antennas were never moved and did not experience any lapse in coverage. A single file was downloaded on 04-25-2020 at 1100 hrs at the conclusion of the interrogation period. The Chewuch Acclimation Pond was de-watered on 04-21-2020, but the arrays were left in the outlet channel for a week after the end of release.
3/1/2018 12:00:00 PM SiteDown Interrogation event log for the Chewuch Acclimation Pond (CWP) - 2018 The Chewuch Acclimation Pond was not utilized by the Yakama Nation Fisheries in 2018. The Yakama Nation Fisheries will acclimate juvenile coho to this site in 2019 and into the foreseeable future.
3/1/2017 12:00:00 PM SiteDown Interrogation event log for the Chewuch Acclimation Pond (CWP) - 2017 The Chewuch Acclimation Pond was not utilized by the Yakama Nation Fisheries in 2017. The Yakama Nation Fisheries will acclimate juvenile coho to this site in 2019 and into the foreseeable future.
4/29/2016 12:00:00 PM SiteDown Interrogation event log for the Chewuch Acclimation Pond (CWP)-2016 release PIT tag interrogation (Antenna 01) for the Chewuch Acclimation Pond, began on 04-21-2016 at 1140 hrs. Antenna (01) was located within outlet bay number 2; there are a total of six outlet bays. Antenna (01) was never moved and did not experience any lapse in coverage. A total of 3 files were created, with the last download completed on 04-29-2016 at 0900 hrs. Staff walked the pond with nets to confirm the site void of spring Chinook prior to the final download. All interrogation equipment was removed on 04-29-2016 after flow was discontinued on 04-28-2016. PIT tag interrogation (Antenna 02) for the Chewuch Acclimation Pond began on 04-21-2016 at 1145 hrs. Antenna (02) was located within outlet bay number 6. Antenna (02) was never moved, and did not experience any lapse in coverage. A total of 3 files were created, with the last download completed on 04-29-2016 at 0905 hrs. All interrogation equipment was removed on 04-29-2016 after flow was discontinued on 04-28-2016. PIT tag interrogation (Antenna 03) for the Chewuch Acclimation Pond began on 04-21-2016 at 1150 hrs. Antenna (03) was located at the base of the circular metal outlet, adjacent to the Chewuch River; 10 meters from the pond. Antenna (03) was never moved, and did not experience any lapse in coverage. A total of 3 files were created, with the last download completed on 04-29-2016 at 0910 hrs. All interrogation equipment was removed on 04-29-2016 after flow was discontinued on 04-28-2016.
5/4/2015 3:29:19 PM General Interrogation event log for the Chewuch Acclimation Pond (CWP)-2015 release PIT tag interrogation (Antenna 01) for the Chewuch Acclimation Pond, began on 04-16-2015 at 2000 hrs.  Antenna 01 was located within outlet bay number 2; there are a total of six outlet bays. Antenna 01 was never moved and did not experience any lapse in coverage. A total of 4 files were created, with the last download completed on 04-27-2015 at 0817 hrs. Staff walked the pond with nets to confirm the site void of spring Chinook on 04-27-2015. All interrogation equipment was removed after flow was discontinued on 04-27-2015. PIT tag interrogation (Antenna 02) for the Chewuch Acclimation Pond began on 04-16-2015 at 2000 hrs. Antenna 02 was located within outlet bay number 6. Antenna 02 was never moved, and did not experience any lapse in coverage. A total of 3 files were created, with the last download completed on 04-27-2015 at 0818 hrs. All interrogation equipment was removed after flow was discontinued on 04-27-2015. PIT tag interrogation (Antenna 03) for the Chewuch Acclimation Pond began on 04-16-2015 at 2000 hrs. This system was located at the base of the circular metal outlet, adjacent to the Chewuch River; 10 meters from the pond. Antenna 02 was never moved, and did not experience any lapse in coverage. A total of 3 files were created, with the last download completed on 04-27-2015 at 0827 hrs. All interrogation equipment was removed after flow was discontinued on 04-27-2015.
5/1/2015 11:59:32 AM General Registered new interrogation site for the Chewuch Acclimation Pond. 

No Archived Event Logs