Interrogation Site Metadata
CWR - Clearwater River at CLWTRP
Status: Active - Operations UnspecifiedGeneral Operational Period: Seasonally
Start Date:
This site consists of a single 20 ft wide by 8 ft deep pass-through antenna placed perpendicular to river current at Clearwater River rkm 10 at the site of the discontinued Clearwater Trap (CLWTRP). The purpose of the antenna is to detect juvenile salmonids as they transition from the free-flowing Clearwater River to Lower Granite Dam Reservoir while emigrating downstream. The antenna is the same NOAA Fisheries design used at PD8. The antenna is mounted on a 20 ft beam on a 6 ft x 10’ pontoon raft with an IS1001 Biomark reader and two 12v batteries. Data is manually downloaded when the batteries are changed every two weeks. The pontoon raft and antenna are held in position by a cable connecting the raft to the CLWTRP traps high line crossing the Clearwater River, and by 30 lb anchors at each end of the 20 ft wide antenna. The antenna is positioned 16 m - 26 m south of the north bank using CLWTRP’s hydraulic winch system. The depth of the antenna may be less than 8’ feet due river current pushing the sides and bottom of antenna downstream.
Current Operations
Last File Loaded: | |
Date Last File Loaded: | 7/11/2025 11:20 AM |
Date Last File Opened: | |
Date Last File Closed: | |
Last Observation Tag: | |
Last Observation Date: | |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.