Interrogation Site Metadata
EBO - East Bank Hatchery Outfall
Status: Active - OperationalGeneral Operational Period: Year Round
Start Date: 8/1/2016 12:00 AM
This site is located in the East Bank Hatchery outfall channel. It has been operated as a pilot site since 2013 with a single antenna and an Allflex RM210 reader board. It will be upgraded to a permanent site in 2016 to have two antennas in series installed in pass-through configuration. Each antenna will span the wetted width of the channel and be powered by a Biomark IS1001 (ACN). The ACNs will be connected to a QST/Biomark QuBE ACN controller.
Current Operations
Last File Loaded: | EBO-2022-131-P-06A.xml |
Date Last File Loaded: | 6/23/2022 3:30 PM |
Date Last File Opened: | 5/11/2022 9:06 PM |
Date Last File Closed: | 6/22/2022 11:00 PM |
Last Observation Tag: | 3D9.1C2D3C548C |
Last Observation Date: | 6/22/2022 8:03 PM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2022 | |||
2021 | 1/8/2021 4:19 PM | 12/22/2021 12:00 AM | Start and end dates based on file open and closed dates. |
2020 | 1/1/2020 12:00 AM | 12/17/2020 12:42 AM | Start and end dates based on file open and close dates. |
2019 | 1/1/2019 12:00 AM | 1/1/2020 12:00 AM | Start and end dates based on file open and close dates. |
2018 | 1/1/2018 12:00 AM | 1/1/2019 12:00 AM | Start and end dates based on file open and close dates. |
2017 | 1/1/2017 12:00 AM | 1/1/2018 12:00 AM | Start and end dates based on file open and close dates. |
2016 | 8/1/2016 12:00 AM | 1/1/2017 12:00 AM | Start and end dates based on file open and close dates. |
2015 | No data received. | ||
2014 | No data received. | ||
2013 | No data received. |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
Upstream Antenna | C1 | 01 |
Downstream Antenna | C1 | 02 |
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
No Photos
Event Log Summary
Event Date | Event Type | Comments |
---|---|---|
2/12/2019 10:28:19 AM | General | Site operated without interruption in 2018. |
9/20/2016 8:34:00 AM | General | On 9-20-16 system clock on reader was reset to Pacific Standard time. |
8/1/2016 11:00:00 AM | SiteUp | At interrogation site EBO, on 8/01/2016 at approximately 10:30 AM, the temporary array was shutdown and a new permanent array was installed. The new array consists of a Qube master controller, two ACN readers, and two Litz antennas. Antenna number 1 (the upstream antenna) is a 15' antenna, and Antenna number 2 (the downstream antenna) is a 20' antenna. This site is up and running and fully operational. |