Interrogation Site Metadata
EFD - East Fork Diversion Fishway
Status: Active - OperationalGeneral Operational Period: Year Round
Start Date: 3/9/2016 12:00 AM
The interrogation site is located in a fish ladder at a irrigation diversion site for the East Fork Irrigation District on the East Fork of the Hood River. The ladder is a vertical slot type construction. Two antennas are installed in a pass through configuration at two of the vertical slots at the downstream end of the ladder. At the upstream terminus of the ladder there is an adult trap that is intermittently operated. The fish ladder and interrogation site is operated seasonally cooresponding to the irrigation season (March to October). The antennas are controlled by two synced Biomark IS1001 ACN readers. Power is provided by solar panel(s) charging a deep cycle battery bank. Interrogation data is manually downloaded periodically.
Current Operations
Last File Loaded: | EFD-2024-074-P-001.json |
Date Last File Loaded: | 3/20/2024 8:01 AM |
Date Last File Opened: | 3/14/2024 2:36 PM |
Date Last File Closed: | 3/19/2024 9:36 AM |
Last Observation Tag: | 3DD.0077B5ECE6 |
Last Observation Date: | 9/12/2023 5:10 PM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2024 | |||
2023 | 2/9/2023 12:00 AM | 12/20/2023 12:00 AM | Start and end dates based on timer tags. |
2022 | 3/28/2022 12:00 AM | 11/29/2022 12:00 AM | Start and end dates based on timer tags. |
2021 | 1/1/2021 12:00 AM | 11/9/2021 12:00 AM | Start and end dates based on timer tags. |
2020 | 1/1/2020 12:00 AM | 1/1/2021 12:00 AM | Start and end dates based on timer tags. See event logs for additional operational information. |
2019 | 1/1/2019 12:00 AM | 12/31/2019 12:00 AM | Start and end dates based on timer tags. |
2018 | 1/12/2018 12:00 AM | 1/1/2019 12:00 AM | Start and end dates based on timer tags. |
2017 | 4/3/2017 12:00 AM | 12/18/2017 12:00 AM | Start and end dates based on timer tags. |
2016 | 3/9/2016 12:00 AM | 10/26/2016 9:00 AM |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
Upstream Antenna | 01 | 01 |
Downstream Antenna | 01 | 02 |
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
Photos
Event Log Summary
Event Date | Event Type | Comments |
---|---|---|
4/3/2017 1:00:00 PM | SiteUp | Site activated for the year corresponding to the East Fork Irrigation District beginning water diversion. |
10/26/2016 9:00:00 AM | SiteDown | Site operations ceased as fish ladder and diversion was shut down at the end of irrigation season. |
3/9/2016 2:00:00 PM | SiteUp | Site began operations for the season. |