Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

ENA - Upper Entiat River at rkm 17.1

Status:   Active - Non-Operational
Site Type: Instream Remote Detection System  |  Organization: Washington Dept. of Fish and Wildlife
General Operational Period: Year Round
Start Date: 4/6/2011 12:00 AM

This is a passive in-stream interrogation system consisting of two rows of three antennas spanning across the width of the river. The site is located approximately 400 meters above the mouth of the Mad River near the township of Ardenvoir at river kilometer 17.1

Current Operations

Last File Loaded: ENA-2024-109-P-001.json
Date Last File Loaded: 4/18/2024 5:31 AM
Date Last File Opened: 4/18/2024 1:26 AM
Date Last File Closed: 4/18/2024 1:26 AM
Last Observation Tag: 3DD.003DA29236
Last Observation Date: 4/17/2024 2:55 PM
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

Matthew Stilwater
matthew.stilwater@dfw.wa.gov
509-664-3148

Data Steward:

Kevin Peterson
kevin.peterson@merck.com
208-484-0446

Location

Coordinates: 47.736615, -120.362532  |  River Km: 778.017

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023 1/1/2023 12:00 AM 1/1/2024 12:00 AM Start and end dates based on timer tags.
2022 1/1/2022 12:00 AM 1/1/2023 12:00 AM Start and end dates based on timer tags.
2021 1/1/2021 12:00 AM 1/1/2022 12:00 AM Start and end dates based on timer tags.
2020 1/1/2020 12:00 AM 1/1/2021 12:00 AM Start and end dates based on timer tags. See event logs for additional operational information.
2019 1/1/2019 12:00 AM 12/31/2019 12:00 AM Start and end dates based on timer tags.
2018 1/1/2018 12:00 AM 1/1/2019 12:00 AM Start and end dates based on timer tags.
2017 1/1/2017 12:00 AM 1/1/2018 12:00 AM Start and end dates based on timer tags.
2016 1/1/2016 12:00 AM 1/1/2017 12:00 AM Start and end dates based on timer tags.
2015 1/1/2015 12:00 AM 1/1/2016 12:00 AM
2014 1/1/2014 12:00 AM 1/1/2015 12:00 AM
2013 1/1/2013 12:00 AM 1/1/2014 12:00 AM
2012 1/1/2012 12:00 AM 1/1/2013 12:00 AM
2011 4/6/2011 12:00 AM 1/1/2012 12:00 AM First year of operations. Site down from June 1-6 due to bad battery charger.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  4/6/2011
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

This displays the last 25 events, to see the full history, log in to theĀ Event Logs.

Event Date Event Type Comments
7/6/2023 11:00:00 AM General

Antenna 2 which lost current on 8 June was replaced as it had filled with water. 

Antenna 3 which lost current on 28 April was reconnected by installing a new Coax cable

Antenna 6 which lost current on 30 May was reconnected by installing a new Coax cable

Site has high noise.  

5/28/2023 2:26:00 PM SiteDown

Site down from 4-28-23 to 5-2-23, fuse needed to be replaced.

4/28/2023 9:31:00 AM General

Power source blew a fuse on 28 April that was replaced on 2 May. Antenna 3 lost current and did not come back on during this down period. 

12/29/2022 9:25:00 AM General

Site went down on 21 November due to issues with landowner power. Visited site on 29 December and restarted equipment. 

10/7/2022 10:50:00 AM General

Antenna 5 was replaced was broken around 6 April 2022. Antenna 6 was plugged back in, had lost current around 1 June 2022.  Coax found faulty. Replaced coax cable to antenna 6 all antennas working. 

10/5/2022 8:40:00 AM General

Antenna 5 had been down since 1 June, 2022 before it was plugged back in on 4 October, 2022.

10/4/2022 2:00:00 PM GMC

Antenna 3 plugged back in. Antenna 5 found to be broken. Antenna 6 has no power due to issues with Antenna 5 being broken. 

7/14/2022 2:59:00 PM General

Antennas 3 and 6 lost current around 6-1-22. Antenna 5 had lost current previously on 4-6-22.

7/27/2021 12:00:00 PM General

At interrogation site ENA on 7/21/2021 at approximately 11:00 AM, Antenna #2 went offline. On 7/27/2021 at approximately 12:00 PM Antenna #2 was replaced. Antenna #2 is functioning and back online.

7/21/2021 10:00:00 AM General

At Interrogation site ENA on 6/03/2021 at approximately 10:00 AM, Antenna #1 went offline. On 7/21/2021 at approximately 11:00 AM, Antenna #1 was replaced. Antenna #1 is functioning and back online. 

8/18/2020 2:00:00 PM General At interrogation site ENA on 8/18/2020 at approximately 2:00 PM, cable and antenna were replaced on Antenna #3. All antennas are functioning. Site is fully operational.
8/18/2020 8:40:00 AM General Antenna #3 and its coax cable were replaced due to low amps and high noise.
7/12/2019 8:40:00 AM SiteUp On 7/12/19 at approximately 3pm site ENA re-established communications and noise dropped substantially after a faulty PS100 battery was removed.
7/12/2018 1:00:00 PM General At interrogation site ENA on 7/12/2018 at approximately 1:00 PM, Antennas #2 and #4 were replaced with HDPE antennas. All antennas at this site are functioning. Site is fully operational.
7/3/2018 10:00:00 AM General At interrogation site ENA on 7/3/2018 at approximately 1:00 PM, antenna #1 was plugged back in and brought back online. Antenna #2 and antenna #4 are broken and need to be replaced.
2/8/2018 9:08:00 AM General On 2/8/18 the coax cable to antenna 4 was replaced and that brought the antenna back online.
1/29/2018 11:44:00 AM General Site visited.
1/18/2018 1:00:00 PM General Antenna #4 went down. Antenna will be repaired or replaced in the near future.
1/17/2018 10:45:00 AM General Site visited.
12/18/2017 10:35:00 AM General Site visited.
12/8/2017 10:40:00 AM General Site visited.
11/27/2017 9:23:00 AM General Site visited.
11/15/2017 9:44:00 AM General Site visited.
11/2/2017 12:20:00 PM General Site visited.
10/29/2017 1:00:00 PM General Site visited. Replaced cable to antenna #5 to correct low and fluctuating current levels. Site is fully operational.

Archived Event Logs