Interrogation Site Metadata
FST - Foster Creek
Status: Active - OperationalGeneral Operational Period: Seasonally
Start Date: 3/14/2014 12:00 AM
FST is a permanent PIT tag interrogation site on Foster Creek. Foster Creek enters the Columbia River at RKM 876.9, approximately 2.2 km up river from the town of Bridgeport, WA. FST is located approximately 0.1 km upstream from the confluence with the Columbia River. The site consists of a single 10 foot antenna anchored upright for pass-through detection. The antenna spans the wetted width of the channel at base flow. When installed in 2014 FST was equipped with an Allflex RM 310 reader and an Acumen data logger powered by batteries. In September 2018, the site was updated with a 10 foot HDPE antenna, IS1001 reader, and solar panels to provide power to the 12V battery bank.
Current Operations
Last File Loaded: | FST-2024-100-P-001.json |
Date Last File Loaded: | 4/25/2024 7:20 AM |
Date Last File Opened: | 4/9/2024 8:18 AM |
Date Last File Closed: | 4/24/2024 6:17 AM |
Last Observation Tag: | 3DD.003DA293C9 |
Last Observation Date: | 4/23/2024 10:49 PM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2024 | |||
2023 | 1/1/2023 12:00 AM | 12/31/2023 12:00 AM | Start and end dates based on timer tags. |
2022 | 1/1/2022 12:00 AM | 12/12/2022 12:00 AM | Start and end dates based on timer tags. |
2021 | 1/11/2021 12:00 AM | 12/3/2021 12:00 AM | Start and end dates based on timer tags. |
2020 | 1/1/2020 12:00 AM | 12/18/2020 12:00 AM | Start and end dates based on timer tags. See event logs for additional operational information. |
2019 | 3/4/2019 12:00 AM | 12/31/2019 12:00 AM | Start and end dates based on timer tags. |
2018 | 3/12/2018 12:00 PM | 12/19/2018 3:00 PM | Allflex RM310 reader and Acumen data logger were replaced with IS1001 in September |
2017 | 3/23/2017 1:00 PM | 6/27/2017 8:15 AM | Start and end dates based on File Created and File Closed times. |
2016 | 3/2/2016 10:45 AM | 10/3/2016 12:00 PM | |
2015 | 2/18/2015 12:00 AM | 11/19/2015 12:00 AM | |
2014 | 3/14/2014 12:00 AM | 11/20/2014 12:00 AM | Data lost from October 28-November 11. Several data logger issues during operational period caused data loss. |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
Single Antenna | 1F | 01 |
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
No Photos
Event Log Summary
This displays the last 25 events, to see the full history, log in to the Event Logs.
Event Date | Event Type | Comments |
---|---|---|
12/19/2022 9:00:00 AM | SiteUp |
Cables repaired and replaced. Power restored and site functioning normally. |
12/11/2022 12:45:00 PM | SiteDown |
Site down due to weight of snow separating power cable from IS-1001 pod. |
2/3/2022 9:57:00 AM | SiteUp |
Site powered up after solar power recharged batteries. |
1/19/2022 1:15:00 PM | SiteDown |
Low voltage at site caused shut down due to minimal solar charging. |
10/18/2021 11:26:00 AM | General |
During site check and download, discovered substantial beaver dam built downstream of the antenna. Possibly limiting adult salmonid navigation. Beaver dam was left as is. |
3/1/2021 4:00:00 PM | SiteUp | Damaged equipment replaced. System is fully operational again. |
2/22/2021 2:00:00 PM | SiteDown | Flood at site. Antenna blown off of T-post, box flooded with water and mud damaging all equipment. |
1/11/2021 1:00:00 PM | SiteUp | Batteries replaced and reader board set back to scan. |
12/17/2020 3:00:00 AM | SiteDown | Reader went to standby due to low current. Shut down until batteries recharge and enough solar energy to sustain operation. |
4/1/2019 12:00:00 PM | SiteUp | Installed new batteries and solar controller. Site operating well. |
3/28/2019 1:00:00 AM | SiteDown | Jobox flooded, resulting in no power getting the the reader. |
2/21/2019 2:00:00 PM | SiteUp | Site activated for the year. Solar is now able to keep up with power demands. |
12/19/2018 12:00:00 PM | SiteDown | Site shut down for winter, solar could no longer meet power requirements. |
9/4/2018 7:24:00 AM | General | Site updated with a 10 foot HDPE antenna, IS1001 reader, and solar panels to provide power to the 12V battery bank. |
3/12/2018 12:00:00 PM | SiteUp | Site activated. |
10/3/2016 11:45:00 AM | SiteDown | Site deactivated. |
3/2/2016 10:45:00 AM | SiteUp | Site install and setup. |
11/19/2015 10:00:00 AM | SiteDown | System shutdown and removal. |
3/9/2015 11:00:00 AM | General | Replace datalogger. |
2/18/2015 11:00:00 AM | SiteUp | Install seasonal Allflex single antenna system. |
2/18/2015 11:00:00 AM | General | System not recording data from 2/18/15-3/9/15. |
11/20/2014 3:00:00 PM | SiteDown | System shutdown and removal. No data recorded. Datalogger issue. |
11/3/2014 9:00:00 AM | General | Data loss from 10/28-11/3. |
8/14/2014 3:16:46 PM | General | Registered new interrogation site FST. |
3/26/2014 9:00:00 AM | General | Replace acumen datalogger and reset Allflex reader amps. |