Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

HS2 - Bottom side channel near ENFH

Status:   Decommissioned
Site Type: Instream Remote Detection System  |  Organization: U.S. Fish and Wildlife Service
General Operational Period: Year Round
Start Date: 7/11/2015 12:00 AM
End Date: 12/16/2016 12:00 AM

This is a pass through single antenna spanning across the width of the channel. The site is located above Roaring Creek River Road Bridge on the Entiat River between the Entiat National Fish Hatchery ladder and the hatchery intake. Site was removed in December 2016

Contacts

Primary Contact:

Nicholas Albrecht
nicholas.albrecht@dfw.wa.gov
509-892-1001 x303

Data Steward:

Tom Desgroseillier
thomas.desgroseillier@dfw.wa.gov
509-669-4572

Location

Coordinates: 47.697967, -120.322040  |  River Km: 778.011

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2016 1/1/2016 12:00 AM 12/16/2016 12:00 AM Site down April 22 - May 16. Site down September 5-16. Site down October 14-28. Site damaged amd removed December 16 and will not be reinstalled or repaired for the foreseeable future.
2015 7/11/2015 12:00 AM 1/1/2016 12:00 AM

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  7/11/2015
End Date:  12/16/2016

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

Photos


Event Log Summary

This displays the last 25 events, to see the full history, log in to theĀ Event Logs.

Event Date Event Type Comments
12/15/2016 11:00:00 AM SiteDown Site down. Site is currently down due to ice flow. Site will not be re-installed or repaired for the foreseeable future.
12/15/2016 10:35:00 AM SiteUp Site up. Low power caused the site to go down. Site is now fully operational after replacing the batteries.
12/15/2016 10:20:00 AM General Site visited. Site down on arrival. Data downloaded, batteries replaced, and tuning checked.
12/2/2016 10:55:00 PM SiteDown Site down. Site down due to low power.
11/28/2016 2:48:00 PM General Site visited. Data downloaded, batteries replaced, and tuning checked. Site fully operational.
11/10/2016 10:00:00 AM General Site visited. Data downloaded, batteries swapped, and tuning checked. Site fully operational.
10/28/2016 11:00:00 AM SiteUp Site up. Disk was replaced. Site is now fully operational.
10/28/2016 11:00:00 AM General Site visited. Site was down on arrival. Data downloaded, batteries swapped, and tuning checked. Site was down on arrival.
10/14/2016 1:00:00 PM SiteDown Site down. Site went down due to a corrupted disk. Attempts will be made to recover lost data.
10/14/2016 1:00:00 PM General Site visited. Data downloaded, batteries swapped, and tuning checked. Site fully operational.
9/28/2016 12:30:00 PM General Site visited. Data downloaded, batteries swapped, and tuning checked. Site fully operational.
9/16/2016 12:00:00 PM SiteUp Site up. Allflex replaced. Site is fully operational.
9/14/2016 12:00:00 PM General Site visited. Data downloaded, batteries swapped, and tuning checked. Site was down on arrival due to a malfunctioning allflex. Site will be repaired in the near future.
9/5/2016 8:30:00 AM SiteDown Sitedown. Site was down on arrival due to a malfunctioning allflex. Site will be repaired in the near future.
8/31/2016 2:15:00 PM General Site visited. Data downloaded, batteries replaced, and tuning checked. Site fully operational.
8/15/2016 11:43:00 AM General Site visited. Data downloaded, batteries replaced, and tuning checked. Site fully operational.
7/29/2016 11:33:00 AM General Site visited. Data downloaded, batteries replaced, and tuning checked. Site fully operational.
7/16/2016 10:40:00 AM General Site visited. Data downloaded, batteries replaced, and tuning checked. Site fully operational.
7/9/2016 1:00:00 PM General Site visited. Data downloaded, batteries replaced, antenna replaced, and tuning checked. Site fully operational.
6/26/2016 1:30:00 PM General Site visited. Data downloaded, batteries replaced, and tuning checked. Site fully operational.
6/23/2016 11:00:00 AM General Site visited. Antenna was moved backed to its original position. Site fully operational.
6/12/2016 8:30:00 AM General Site visited. Data downloaded, batteries replaced, and tuning checked. Site fully operational.
5/29/2016 10:45:00 AM General Site visited. Data downloaded, batteries swapped, and tuning checked. Site fully operational.
5/20/2016 8:15:00 AM General Site visited.
5/18/2016 9:10:00 AM General Site visited. Data downloaded, batteries swapped, and tuning checked. Site fully operational.

No Archived Event Logs