Interrogation Site Metadata
HST - Touchet River at Harvey Shaw
Status: Active - OperationalGeneral Operational Period: Year Round
Start Date: 9/1/2015 12:00 AM
HST is a permanent instream PIT tag interrogation site at RKM 50 on the Touchet river. The current site configuration consists of two rows of antennas, with each row spanning the wetted width of the channel during base flows. The site consists 2 rows of antennas. The upper row consists of 2 20-foot HDPE antennas and 1 10-foot HDPE antenna. The lower row consist of 3 20-foot HDPE antennas and 1 10-foot PVC antenna, all are installed in a flat-plate configuration. Each antenna is powered by a Biomark IS1001-MC multiplexing transceiver. The antennas were built and installed by WDFW. The electrical power at the site is provided by the Walla Walla grain growers 110 electrical outlet on site. A cellular modem is installed on site to provide remote communication and allow for automated data collection. The site was updated in October 2020 from its previous configuration that consisted of nine antennas in two rows.
Current Operations
Last File Loaded: | HST-2023-148-P-006.json |
Date Last File Loaded: | 5/29/2023 2:40 AM |
Date Last File Opened: | 5/28/2023 8:52 PM |
Date Last File Closed: | 5/29/2023 12:00 AM |
Last Observation Tag: | 3DD.003DFFB72A |
Last Observation Date: | 5/28/2023 11:09 PM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2023 | |||
2022 | 1/1/2022 12:00 AM | 12/30/2022 12:00 AM | Start and end dates based on timer tags. |
2021 | 1/1/2021 12:00 AM | 1/1/2022 12:00 AM | Start and end dates based on timer tags. |
2020 | 1/1/2020 12:00 AM | 1/1/2021 12:00 AM | Start and end dates based on timer tags. See event logs for additional operational information. |
2019 | 1/1/2019 12:00 AM | 12/31/2019 12:00 AM | Start and end dates based on timer tags. |
2018 | 1/1/2018 12:00 AM | 1/1/2019 12:00 AM | Start and end dates based on file open and close dates. |
2017 | 1/1/2017 12:00 AM | 1/1/2018 12:00 AM | Start and end dates based on file open and close dates. |
2016 | 1/1/2016 12:00 AM | 1/1/2017 12:00 AM | Start and end dates based on file open and close dates. |
2015 | 9/1/2015 12:00 AM | 1/1/2016 12:00 AM | Start and end dates based on file open and close dates. |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
Upstream Array | C1 | 01 |
Upstream Array | C1 | 02 |
Upstream Array | C1 | 03 |
Downstream Array | C1 | 04 |
Downstream Array | C1 | 05 |
Downstream Array | C1 | 06 |
Downstream Array | C1 | 07 |
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
Photos
Event Log Summary
Event Date | Event Type | Comments |
---|---|---|
7/11/2022 12:00:00 PM | General |
Disconnected antenna #1 for the summer as it is out of the water. |
6/18/2021 11:00:00 AM | General |
Disabled antenna #1 for the summer. Replaced pods on antennas 2 and 5. Now Antennas 2-7 are working. |
5/18/2020 12:00:00 PM | SiteUp | Site running, antennas 1-5. |
5/8/2020 12:00:00 PM | SiteDown | Site down due to a short in the system. |
3/12/2020 3:17:50 PM | SiteUp | All antennas are operational and running. |
2/7/2020 7:12:00 AM | SiteDown | Site down due to flood waters. |
11/18/2019 11:08:51 AM | General | re-enabled antenna #1 for the season. |
6/18/2019 7:27:00 AM | General | Antenna 4 is up and running, changed from a 10 foot antenna to a 20 foot antenna. |
6/4/2019 7:27:00 AM | General | Antennas 5 and 6 are back up and running. Antenna 1 is disabled for the summer as it is out of the water and will be restarted in the fall. |
4/9/2019 7:27:00 AM | General | Antennas 1 and 6 are down, will fix when flows allow |
1/30/2019 7:27:00 AM | General | Antennas 4 and 5 are down, will fix when flows allow |
6/20/2017 1:19:21 PM | General | • Harvey Shaw Touchet (HST) – Site visit January 3th . Replaced batteries. Site monitored remotely. Antenna #1 broke during high flows, will replace soon. February 14th Antenna # 8 totally shorting out and blowing fuse on the cube and also disconnected 1,6,7 and 8. February 20th continued flood like river discharge has damaged or destroyed most of the site making any repair problematic at this time. June 19th repairs are ongoing and should be completed this summer. |
9/14/2015 2:04:05 PM | General | Registered new interrogation site in PTAGIS: HST - Touchet River at Harvey Shaw |