Jacks Creek is a tributary of the lower Clearwater River, Idaho. The confluence of Jacks Creek is on the south side of the Clearwater River at river kilometer 47. Jacks Creek is about 10 miles long, drains about 15,000 acres, and is a minor spawning area for Snake River summer steelhead within the Lower Mainstem Clearwater steelhead population. The Jacks Creek interrogation site was installed as a temporary and seasonal site downstream of river kilometer 1 to estimate steelhead abundance within the Jacks Creek spawning aggregate because an interrogation sites downstream of the Lower Mainstem Clearwater capable of providing a population estimate for the population does not exist.

Current Operations

Last File Loaded: JA1-2022-152-P-00A.xml
Date Last File Loaded: 6/13/2022 3:11 PM
Date Last File Opened: 6/1/2022 2:10 PM
Date Last File Closed: 6/8/2022 8:10 AM
Last Observation Tag: 3DD.007776503A
Last Observation Date: 6/7/2022 1:56 PM
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

John Robbins
johnr@nezperce.org
208-634-5290 x3307

Data Steward:

Peter Cleary
peterc@nezperce.org
208-621-3572

Location

Coordinates: 46.503864, -116.549759  |  River Km: 522.224.047.001

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023 Site did not operate in 2023.
2022 2/9/2022 12:00 AM 6/9/2022 12:00 AM Start and end dates based on timer tags.
2021 1/26/2021 12:00 AM 6/9/2021 12:00 AM Start and end dates based on timer tags.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  1/1/2021
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

Event Date Event Type Comments
12/31/2023 11:00:00 PM SiteDown

JA1 was not operated in 2023 and is inactive. 

6/8/2022 8:00:00 AM SiteDown

This seasonal IPTDS was powered down on this day and all antennas and equipment were removed from the site between June 8 and June 23.

3/4/2022 2:07:00 PM General

The downstream node (02) was damaged during high water. The node was replaced and tuned. The system is operating again.  

3/3/2022 5:49:00 PM General

The downstream array (02)was showing low current. There was high water and it damaged the node.

2/2/2022 12:00:00 PM SiteUp

Seasonal operation of JA1 began for 2022 after the system was powered up and tested.

6/8/2021 12:00:00 PM General

Operation of JA1 was discontinued for 2021.

2/13/2021 12:00:00 PM General

Interruptions in operation occurred intermittently due to power issues.

2/5/2021 12:00:00 PM General

Interruptions in operation  occurred intermittently due to power issues.

1/28/2021 12:00:00 PM General

JA1 testing was completed and date collection operations began.

1/26/2021 5:00:00 PM General

JA1 was installed and testing of the system began.