Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

LAW - Lawyer Creek Seasonal IPTDS

Status:   Active - Operational
Site Type: Instream Remote Detection System  |  Organization: Nez Perce Tribe
General Operational Period: Seasonally
Start Date: 2/9/2023 12:00 AM

Lawyer Creek is a tributary of the lower Clearwater River, Idaho. The confluence of Lawyer Creek is on the west side of the Clearwater River at river kilometer 109. Lawyers Creek is about 41 miles long, draining 137,360 acres, and is considered a major spawning area for Snake River summer steelhead within the Lower Mainstem Clearwater steelhead population. The Lawyer Creek interrogation site was installed as a temporary and seasonal site at river kilometer 1.5 to estimate steelhead abundance within the Lawyer Creek spawning aggregate because an interrogation site downstream of the Lower Mainstem Clearwater capable of providing a population estimate for the population does not exist.

Current Operations

Last File Loaded: LAW-2024-100-P-001.json
Date Last File Loaded: 4/17/2024 11:40 AM
Date Last File Opened: 4/9/2024 2:55 PM
Date Last File Closed: 4/17/2024 8:40 AM
Last Observation Tag: 3DD.003E2B6B5A
Last Observation Date: 4/17/2024 8:40 AM
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

Mike Kosinski
mkosinski@nezperce.org
208-621-3570

Data Steward:

Peter Cleary
peterc@nezperce.org
208-621-3572

Location

Coordinates: 46.218469, -116.028985  |  River Km: 522.224.109.001

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023 2/9/2023 12:00 AM 2/16/2023 12:00 AM Start and end dates based on timer tags.
2023 2/9/2023 12:00 AM 2/16/2023 12:00 AM Start and end dates based on timer tags.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  1/27/2023
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

Event Date Event Type Comments
11/8/2023 12:00:00 PM SiteUp

Site received enough solar power where it has turned and is functioning now. All equipment appears to be in working order.

11/7/2023 1:00:00 PM SiteDown

Breaker on solar controller was tripped, and reader was off. Possibly due to heavy rainfall or lightning that has occurred over the last few days. Turned breaker back on and incoming voltage was between 60-72 volts. Will let charge and check on 11/8/2023.

11/4/2023 8:23:00 PM SiteDown

Looking at log file this is when LAW went down 

10/16/2023 2:00:00 PM SiteUp

LAW up and running for fall 2023 with new MC box and now running with solar panel charging. All 4 antennas showed minimum 10 inch read range with test tags.

6/1/2023 1:00:00 PM SiteDown

Site turned off for the season. Batteries and MC box to be removed on 6/6/2023

5/25/2023 10:00:00 AM GMC

Present noise on node 02 was 51% upon checking it today. Performed a full tune and it dropped to 7%. On checking it on 5/18/2023, noise was 7%. Could be due to water cascading down off the downstream side of the antenna?

5/4/2023 2:00:00 PM SiteUp

Noticed that MC box was set to standby. Changed to scan.

4/29/2023 9:00:00 AM SiteDown

MC set to standby mode by mistake 

3/2/2023 10:00:00 AM SiteUp

Site up after an overnight battery charge from the external battery

2/28/2023 8:00:00 AM SiteDown

Site went down due to power failure

2/23/2023 5:00:00 PM SiteUp

Site back up with battery power

2/23/2023 6:00:00 AM SiteDown

Site down due to battery failure

2/9/2023 11:55:00 AM SiteUp

Site excavated from 2/1/2023 through 2/2/2023

Antennas installed on 2/6/2023

Reader box installed on 2/7/2023

Mortality hatchery coho PIT tag detected on Node 1 upon installation. Attempts to re-excavate and find tag with HPR handheld readers and magnet unsuccessful. Tag continues to read constantly on Node 1

Old memory erased and full antenna tune performed on 2/9/2023. 

New flash drive installed on reader board at 1155 on 2/9/2023

Lawyer Creek IPTDS fully operational and reading on 2/9/2023 1155. 

 

No Archived Event Logs