Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

LB8 - Big Eightmile Creek

Status:   Decommissioned
Site Type: Instream Remote Detection System  |  Organization: Idaho Dept. of Fish and Game
General Operational Period: Year Round
Start Date: 7/6/2015 12:00 AM
End Date: 3/14/2018 7:00 AM

This in-stream detection system on Big Eightmile Creek is located approximately 0.5 km upstream of the confluence with the Lemhi River and is comprised of two arrays. The upstream and downstream arrays each consist of one 10 ft antenna. The site is located 50 meters upstream of the bridge on Idaho state highway 28. LB8 is operated by the Integrated Status and Effectiveness Monitoring Project (ISEMP) cooperators Idaho Fish and Game and Quantitative Consultants, Inc. This site is powered by a battery bank, which is charged by solar panels. Remote communication is provided by a cellular telephone modem. Site was removed in March 2018

Contacts

Data Steward:

Brett Turley
brett.turley@merck.com
208-841-2562

Location

Coordinates: 44.738218, -113.462458  |  River Km: 522.303.416.073.001

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2018 1/1/2018 12:00 AM 3/14/2018 7:00 AM End date based on last data file recieved. Site was permanently removed March 21.
2017 1/1/2017 12:00 AM 1/1/2018 12:00 AM No operational information received, but files submitted regularly throughout the year.
2016 1/1/2016 12:00 AM 1/1/2017 12:00 AM No operational information received, but files submitted regularly throughout the year.
2015 7/6/2015 12:00 AM 1/1/2016 12:00 AM No operational information received, but files submitted regularly throughout the year.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  7/6/2015
End Date:  3/21/2018

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

Event Date Event Type Comments
10/30/2015 2:54:52 PM General Registered new interrogation site on Big Eightmile Creek - LB8.

No Archived Event Logs