Interrogation Site Metadata
LBS - Big Springs Creek
Status: Active - Operations UnspecifiedGeneral Operational Period: Year Round
Start Date: 7/27/2014 12:00 AM
An in-stream detection system consisting of two antennas located on Big Springs Creek approximately 300 meters upstream from the confluence with the Lemhi River. The initial configuration of consisting of three arrays of two antennas each was replaced in May 2017 with two 20 ft antennas deployed about 37 meters apart.
Current Operations
Last File Loaded: | LBS-2024-117-P-002.json |
Date Last File Loaded: | 4/26/2024 12:20 PM |
Date Last File Opened: | 4/26/2024 7:58 AM |
Date Last File Closed: | 4/26/2024 10:58 AM |
Last Observation Tag: | 3DD.003D57FC72 |
Last Observation Date: | 4/25/2024 9:01 PM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2024 | |||
2023 | 1/1/2023 12:00 AM | 1/1/2024 12:00 AM | Start and end dates based on timer tags. |
2022 | 1/1/2022 12:00 AM | 1/1/2023 12:00 AM | Start and end dates based on timer tags. |
2021 | 1/1/2021 12:00 AM | 1/1/2022 12:00 AM | Start and end dates based on timer tags. |
2020 | |||
2019 | 1/7/2019 5:00 AM | 4/23/2019 5:00 PM | Start and end dates based on file open and close dates. |
2018 | 1/1/2018 12:00 AM | 12/30/2018 12:00 AM | Start and end dates based on file open and close dates. |
2017 | 1/1/2017 12:00 AM | 1/1/2018 12:00 AM | Start and end dates based on file open and close dates. |
2016 | 1/1/2016 12:00 AM | 1/1/2017 12:00 AM | Start and end dates based on file open and close dates. |
2015 | 1/9/2015 12:00 AM | 1/1/2016 12:00 AM | Start and end dates based on file open and close dates. |
2014 | 7/27/2014 12:00 AM | 12/25/2014 12:00 AM | Start and end dates based on file open and close dates. |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
Upstream Antenna | 01 | 01 |
Downstream Antenna | 02 | 02 |
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
No Photos
Event Log Summary
Event Date | Event Type | Comments |
---|