Interrogation Site Metadata
LC2 - Upper Lolo Creek at rkm 25
Status: Active - OperationalGeneral Operational Period: Year Round
Start Date: 11/4/2011 12:00 AM
Instream detection system consisting of a single array located in the Lolo Creek, a tributary to the Clearwater River. The array (LC2) is located at river km 522.224.087.025 (N 46.290562 W -115.934153) and consists of four 20 foot Biomark flat panel antennas that span the entire river at base flow. LC2 is operated by the Integrated Status and Effectiveness Project (ISEMP) cooperators Nez Perce Tribe and Quantitative Consultants, Inc. and was installed for continuous monitoring in November 2011. The array includes ISEMP standard site monitoring equipment including: air and water temperature probes, and a water pressure transducer to monitor stream level. Electrical power is provided using a solar/propane hybrid thermal electric generator and remote communication provided by a satellite phone modem.
Current Operations
Last File Loaded: | LC2-2023-148-P-006.json |
Date Last File Loaded: | 5/29/2023 3:40 AM |
Date Last File Opened: | 5/28/2023 9:46 PM |
Date Last File Closed: | 5/29/2023 12:46 AM |
Last Observation Tag: | 3DD.003D494297 |
Last Observation Date: | 5/28/2023 11:57 AM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2023 | |||
2022 | 1/1/2022 12:00 AM | 1/1/2023 12:00 AM | Start and end dates based on timer tags. |
2021 | 1/1/2021 12:00 AM | 1/1/2022 12:00 AM | Start and end dates based on timer tags. |
2020 | 1/1/2020 12:00 AM | 1/1/2021 12:00 AM | Start and end dates based on timer tags. See event logs for additional operational information. |
2019 | 1/1/2019 12:00 AM | 12/31/2019 12:00 AM | Start and end dates based on timer tags. |
2018 | 1/1/2018 12:00 AM | 1/1/2019 12:00 AM | Start and end dates based on timer tags. |
2017 | 1/1/2017 12:00 AM | 1/1/2018 12:00 AM | Start and end dates based on timer tags. |
2016 | 1/1/2016 12:00 AM | 1/1/2017 12:00 AM | Start and end dates based on timer tags. |
2015 | 1/1/2015 12:00 AM | 1/1/2016 12:00 AM | |
2014 | 1/1/2014 12:00 AM | 1/1/2015 12:00 AM | |
2013 | 1/1/2013 12:00 AM | 1/1/2014 12:00 AM | Site down from August 22-September 17 due to wildfire in the area. |
2012 | 1/1/2012 12:00 AM | 1/1/2013 12:00 AM | |
2011 | 11/4/2011 12:00 AM | 1/1/2012 12:00 AM |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
SINGLE ARRAY | A0 | A1 |
SINGLE ARRAY | A0 | A2 |
SINGLE ARRAY | A0 | A3 |
SINGLE ARRAY | A0 | A4 |
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
Photos
Event Log Summary
Event Date | Event Type | Comments |
---|---|---|
7/20/2022 12:00:00 AM | SiteUp |
LC2 is running continuously without disruption through 07/22/2022 |
10/14/2021 12:00:00 AM | General |
LC2 antenna cable A2 failed on September 24, 2021. A2 antenna cable was replaced with a new 100 ft. cable on October 14, 2021. 5 empty propane tanks were replaced with 5 full tanks. LC2 is operating continuously without disruption through November 2, 2021. |
12/8/2020 2:01:00 PM | General | LC2 thermoelectric generator (TEG) spark ignitor adjustment made on December 8, 2020. TEG was not self-starting and charging batteries. |
11/2/2020 4:05:28 PM | General | Lolo Creek 2 (LC2) antenna B3 lost current on October 12, 2020. Antenna B3 was replaced with a 20 ft. PVC antenna on October 28, 2020. LC2 is operating continuously without disruption through November 2, 2020. |
9/1/2020 4:02:00 PM | General | Upper Lolo Creek PIT array (LC2). Exchanged 4 empty propane bottles for 4 full ones. Replaced propane hoses that were compromised by an animal chewing on them. New hoses have an armored shield. LC2 is operating continuously without disruption through September 21, 2020. |
6/8/2020 6:28:00 AM | General | Satellite SIM Card Swap and site maintenance. Checked TEG and propane fittings. Added wire mesh to propane hoses to deter wildlife. |
9/4/2019 3:47:00 PM | General | Lolo Creek 2 (LC2) lost current to all four antennas on April 10, 2019 due to extremely high flows thus ripping all antenna cables from antennas A1-A4. Antennas A1 and A4 were replaced with 20 ft. PVC Biomark antennas due to water leaking into the antennas through the cable connection. Antennas A2 and A3, were simply plugged back in and re-secured. All antennas are operational again as of September 4, 2019. |
4/10/2019 7:31:00 AM | SiteDown | Lolo Creek 2 lost current to all four antennas during a high water event on 4/10/19. Site is down, although power supply and electronics within the enclosure remain intact. |
10/8/2018 7:10:00 AM | General | Lolo Creek Array (LC2) had Campbell Scientific data logger replaced with a new data logger designed by Biomark on October 8, 2018. A new HughsNet satellite modem was also installed to replace the existing Globalstar modem. LC2 site air temperature probe was changed out for a compatible model. LC2 is operating continuously without disruption through October 21, 2018. |
5/8/2018 3:30:00 PM | General | Replaced all six solar array batteries with new ones on 5/8/18. LC2 is running continuously without disruption through 9/19/18. |
10/24/2017 8:14:00 AM | General | Lolo Creek 2 (LC2) lost remote communications on 8/29/17 due to a faulty satellite modem. The modem was replaced on 10/24/17 and normal communications resumed. LC2 is running continuously without disruption through 10/30/17. |
5/19/2017 11:31:00 AM | General | The optical isolator between the MUX and data logger was replaced at Lolo Creek 2 (LC2) on May 19, 2017. LC2 has run continuously without disruption through 06/09/2017. |
11/16/2016 9:08:00 AM | General | Lolo Creek 2 array (LC2) is functioning and operational without disruption through 11/16/16. |
9/21/2015 1:59:00 PM | General | Antennas 1 and 4 were replaced with 20 ft. Biomark lite antenna style due to low antenna current and consequently reduced antenna read range. |
9/23/2014 10:44:58 AM | General | Lolo Creek 2 (LC2) is functioning and operational without disruption through 9/23/14 |