Interrogation Site Metadata
LCC - Lolo Creek Confluence
Status: Active - OperationalGeneral Operational Period: Seasonally
Start Date:
This site consists of a single 12 ft wide by 4.5 ft deep pass-through antenna placed perpendicular to river current at the confluence of Lolo Creek in the Clearwater River rkm 86.9. The purpose of the antenna is to detect juvenile salmonids migrating in the fall. The Transceiver ID is 02 due to prior use at PTAGIS Site CWR. Approximate period of operation will be from September 1 to December 15. The antenna is constructed from LITZ cable and mounted on an aluminum and wood frame on the back of a 6 ft x 10’ pontoon raft. A remote-controlled winch rotates the antenna frame into and out of the water and allows the antenna frame to be adjusted for the depth of the water. The antenna is connected to an IS1001 Biomark reader with a Bluetooth data logger board and powered by a 400W solar array with two 12v lithium batteries. Data is manually downloaded. The pontoon raft is held in position by an 80 lb anchor and with a safety line tethered to the bank of the Clearwater River downstream of the Lolo Creek confluence.
Current Operations
| Last File Loaded: | LCC-2026-294-P-001.json |
| Date Last File Loaded: | 11/19/2026 4:40 PM |
| Date Last File Opened: | 10/21/2026 12:19 PM |
| Date Last File Closed: | 11/18/2026 11:09 AM |
| Last Observation Tag: | 3DD.0078CC86FA |
| Last Observation Date: | 11/18/2026 6:20 AM |
| Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.