Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

LCL - Lee Creek, Lemhi R. Basin

Status:   Decommissioned
Site Type: Instream Remote Detection System  |  Organization: Biomark
General Operational Period: Year Round
Start Date: 8/25/2014 2:03 AM
End Date: 3/29/2018 7:00 PM

In-stream detection system currently consisting of two antennas located in Lee Creek approximately 50 meters upstream of the confluence with the Lemhi River. The Lee Creek array site is located 140 m below the culvert on Highway 28. LCL is operated by the Integrated Status and Effectiveness Project (ISEMP) cooperators Idaho Fish and Game and Quantitative Consultants, Inc. and was installed for continuous monitoring in December 2013. This site is powered by a 24 volt solar powered system and remote communication is provided by a cellular telephone modem. Environmental conditions are monitored by air temperature, water temperature, and water depth sensors. The initial site configuration consisting of three antennas deployed about 10 meters apart was replaced in October 2016 with two 10 ft antennas deployed about 20 meters apart. Site was removed in April 2018

Contacts

Primary Contact:

Kyle Meier
kyle.meier@merck.com
208-275-0011

Data Steward:

Brett Turley
brett.turley@merck.com
208-841-2562

Location

Coordinates: 44.747074, -113.474641  |  River Km: 522.303.416.079.001

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2018 1/1/2018 12:00 AM 3/29/2018 7:00 PM End date based on last file loaded. Site permanently removed April 11.
2017 1/1/2017 12:00 AM 1/1/2018 12:00 AM No operational information received, but files submitted regularly throughout the year.
2016 1/1/2016 12:00 AM 1/1/2017 12:00 AM No operational information received, but large gap in data from March 19 - October 19.
2015 3/21/2015 3:40 PM 1/1/2016 12:00 AM Start date based on File Created value from first file loaded this year. Site down October 2 - November 9.
2014 8/25/2014 2:03 AM 9/30/2014 8:45 PM Start date and end date based on File Created and File Closed values from only file received this year.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  10/19/2016
End Date:  4/11/2018

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

Event Date Event Type Comments
11/9/2015 12:00:00 PM SiteUp Site is back up and running with two antennas running: The upper most antenna and the lower most antenna. Will get final middle antenna running in the next few days.
10/2/2015 12:00:00 PM SiteDown Site went down due to short in wiring. Removed reader pods. New reader pods and wiring will need to built and installed.
3/6/2014 4:48:05 PM General Registered new site in PTAGIS

No Archived Event Logs