Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

LD1 - Lebanon Dam South Ladder

Status:   Active - Operational
Site Type: Adult Fishway  |  Organization: Biomark
General Operational Period: Year Round
Start Date: 5/27/2015 12:00 AM

Two instream arrays installed in the south fish ladder at Lebanon dam on the South Santiam River, a tributary to the Willamette River. The upstream array consists of three externally shielded pass-through antennas located at the ladder exit and the downstream array consists of two internally shielded pass-through antennas covering the ladder orifices of weir 7 and one unshielded cord antenna covering the center slot of weir 7. The antennas are powered by a Biomark Master Controller and IS1001 readers. The site is powered by AC power and data is collected using a cell modem. The site was originally operated by ODFW from 2015-2018 and was reinstalled in 2022.

Current Operations

Last File Loaded: LD1-2024-116-P-003.json
Date Last File Loaded: 4/25/2024 4:40 PM
Date Last File Opened: 4/25/2024 11:38 AM
Date Last File Closed: 4/25/2024 2:38 PM
Last Observation Tag: 3DD.003BD2BF45
Last Observation Date: 4/24/2024 11:28 AM
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

Fenton Khan
fenton.o.khan@usace.army.mil
503-808-4777

Data Steward:

Kevin Peterson
kevin.peterson@merck.com
208-484-0446

Location

Coordinates: 44.516100, -122.862744  |  River Km: 163.174.019.032

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023 1/1/2023 12:00 AM 1/1/2024 12:00 AM Start and end dates based on timer tags.
2022 9/22/2022 12:00 AM 1/1/2023 12:00 AM Start and end dates based on timer tags.
2018 1/1/2018 12:00 AM 11/15/2018 12:00 AM Start and end dates based on timer tags.
2017 1/1/2017 12:00 AM 1/1/2018 12:00 AM Start and end dates based on timer tags.
2016 1/7/2016 12:00 AM 1/1/2017 12:00 AM Start and end dates based on timer tags.
2015 5/27/2015 12:00 AM 12/26/2015 12:00 AM Start and end dates based on timer tags.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  9/22/2022
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

Photos


Event Log Summary

Event Date Event Type Comments
9/22/2022 12:00:00 PM SiteUp

Site operational as of 09/22/2022 @ 1200PST.

11/30/2018 3:43:00 PM SiteDown Flooding badly damaged site, beyond immediate repair. Plans to repair site in spring/summer of 2021.
12/22/2017 9:20:00 AM SiteUp Site back up. Ladder antennas now working again after fixing cable connection.
11/25/2017 9:30:00 PM SiteDown Site Down. Likely cable short on downstream antenna. High Water over-topped antenna causing cable to abrade. Will fix as soon as antenna is accessible again.
10/16/2016 12:00:00 PM General High noise today, system wide
9/30/2016 12:00:00 PM SiteUp System operational
9/28/2016 12:00:00 PM SiteDown System down
8/17/2016 12:00:00 PM General Moderate noise on antenna #1 from 7/29/2016 to 8/17/2016
4/30/2016 12:00:00 PM SiteUp System operational
4/28/2016 12:00:00 PM SiteDown System down
2/9/2016 12:00:00 PM SiteUp Antenna #4 in operation again
1/19/2016 3:18:00 PM SiteUp Site Up. Communication restored for Antennas 1-3. Still working on number 4.
1/15/2016 10:48:00 AM SiteDown Site down. Node 4 replacement caused miscommunication between nodes and MC.
1/7/2016 10:48:00 AM SiteUp Site up. Antennas 1-3 up. Removed node for Antenna 4 for replacement.
12/26/2015 8:54:00 AM SiteDown Site Down. Master Controller won't power-up, sent back to Biomark for repair. Plan to replace week of 1/4/2016. No known reason for MC malfunction.
12/22/2015 12:00:00 PM SiteUp System operational
12/20/2015 12:00:00 PM SiteDown System down
11/13/2015 12:00:00 PM General Antenna #4 deployed
10/6/2015 12:00:00 PM General High noise today, full system
9/23/2015 12:00:00 PM SiteUp System operational
8/26/2015 12:00:00 PM SiteDown System down
7/30/2015 10:43:00 AM General Registered new site LD1 in PTAGIS.

No Archived Event Logs