Interrogation Site Metadata
LD1 - Lebanon Dam South Ladder
Status: Active - OperationalGeneral Operational Period: Year Round
Start Date: 5/27/2015 12:00 AM
Two instream arrays installed in the south fish ladder at Lebanon dam on the South Santiam River, a tributary to the Willamette River. The upstream array consists of three externally shielded pass-through antennas located at the ladder exit and the downstream array consists of two internally shielded pass-through antennas covering the ladder orifices of weir 7 and one unshielded cord antenna covering the center slot of weir 7. The antennas are powered by a Biomark Master Controller and IS1001 readers. The site is powered by AC power and data is collected using a cell modem. The site was originally operated by ODFW from 2015-2018 and was reinstalled in 2022.
Current Operations
Last File Loaded: | LD1-2024-116-P-003.json |
Date Last File Loaded: | 4/25/2024 4:40 PM |
Date Last File Opened: | 4/25/2024 11:38 AM |
Date Last File Closed: | 4/25/2024 2:38 PM |
Last Observation Tag: | 3DD.003BD2BF45 |
Last Observation Date: | 4/24/2024 11:28 AM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2024 | |||
2023 | 1/1/2023 12:00 AM | 1/1/2024 12:00 AM | Start and end dates based on timer tags. |
2022 | 9/22/2022 12:00 AM | 1/1/2023 12:00 AM | Start and end dates based on timer tags. |
2018 | 1/1/2018 12:00 AM | 11/15/2018 12:00 AM | Start and end dates based on timer tags. |
2017 | 1/1/2017 12:00 AM | 1/1/2018 12:00 AM | Start and end dates based on timer tags. |
2016 | 1/7/2016 12:00 AM | 1/1/2017 12:00 AM | Start and end dates based on timer tags. |
2015 | 5/27/2015 12:00 AM | 12/26/2015 12:00 AM | Start and end dates based on timer tags. |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
Upstream Array | 10 | 11 |
Upstream Array | 10 | 12 |
Upstream Array | 10 | 13 |
Downstream Array | 10 | 14 |
Downstream Array | 10 | 15 |
Downstream Array | 10 | 16 |
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
Photos
Event Log Summary
Event Date | Event Type | Comments |
---|---|---|
9/22/2022 12:00:00 PM | SiteUp |
Site operational as of 09/22/2022 @ 1200PST. |
11/30/2018 3:43:00 PM | SiteDown | Flooding badly damaged site, beyond immediate repair. Plans to repair site in spring/summer of 2021. |
12/22/2017 9:20:00 AM | SiteUp | Site back up. Ladder antennas now working again after fixing cable connection. |
11/25/2017 9:30:00 PM | SiteDown | Site Down. Likely cable short on downstream antenna. High Water over-topped antenna causing cable to abrade. Will fix as soon as antenna is accessible again. |
10/16/2016 12:00:00 PM | General | High noise today, system wide |
9/30/2016 12:00:00 PM | SiteUp | System operational |
9/28/2016 12:00:00 PM | SiteDown | System down |
8/17/2016 12:00:00 PM | General | Moderate noise on antenna #1 from 7/29/2016 to 8/17/2016 |
4/30/2016 12:00:00 PM | SiteUp | System operational |
4/28/2016 12:00:00 PM | SiteDown | System down |
2/9/2016 12:00:00 PM | SiteUp | Antenna #4 in operation again |
1/19/2016 3:18:00 PM | SiteUp | Site Up. Communication restored for Antennas 1-3. Still working on number 4. |
1/15/2016 10:48:00 AM | SiteDown | Site down. Node 4 replacement caused miscommunication between nodes and MC. |
1/7/2016 10:48:00 AM | SiteUp | Site up. Antennas 1-3 up. Removed node for Antenna 4 for replacement. |
12/26/2015 8:54:00 AM | SiteDown | Site Down. Master Controller won't power-up, sent back to Biomark for repair. Plan to replace week of 1/4/2016. No known reason for MC malfunction. |
12/22/2015 12:00:00 PM | SiteUp | System operational |
12/20/2015 12:00:00 PM | SiteDown | System down |
11/13/2015 12:00:00 PM | General | Antenna #4 deployed |
10/6/2015 12:00:00 PM | General | High noise today, full system |
9/23/2015 12:00:00 PM | SiteUp | System operational |
8/26/2015 12:00:00 PM | SiteDown | System down |
7/30/2015 10:43:00 AM | General | Registered new site LD1 in PTAGIS. |