Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

LD2 - Lebanon Dam North Ladder

Status:   Active - Non-Operational
Site Type: Adult Fishway  |  Organization: Biomark
General Operational Period: Year Round
Start Date: 4/16/2015 12:00 AM

Instream array installed in the north fish ladder at Lebanon dam on the South Santiam River, a tributary to the Willamette River. A pass-through externally shielded antenna is located at the ladder exit on weir 7. An externally shielded antenna is located at the overflow of weir 4 and an internally shielded antenna is located at the weir 4 orifice. The antennas are powered by a Biomark Master Controller and IS1001 readers. The site is powered by AC power and data is collected using a cell modem. The site was originally operated by ODFW from 2015-2018 and was reinstalled in 2022.

Current Operations

Last File Loaded: LD2-2024-115-P-001.json
Date Last File Loaded: 4/24/2024 4:44 AM
Date Last File Opened: 4/24/2024 12:03 AM
Date Last File Closed: 4/24/2024 3:03 AM
Last Observation Tag: 3DD.003BD57C98
Last Observation Date: 4/22/2024 7:08 AM
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

Fenton Khan
fenton.o.khan@usace.army.mil
503-808-4777

Data Steward:

Kevin Peterson
kevin.peterson@merck.com
208-484-0446

Location

Coordinates: 44.517113, -122.862786  |  River Km: 163.174.019.032

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023 9/13/2023 12:00 AM 1/1/2024 12:00 AM Start and end dates based on timer tags.
2022 10/4/2022 12:00 AM 12/1/2022 12:00 AM Start and end dates based on timer tags.
2018 1/1/2018 12:00 AM 12/16/2018 12:00 AM Start and end dates based on timer tags.
2017 1/1/2017 12:00 AM 1/1/2018 12:00 AM Start and end dates based on timer tags.
2016 1/19/2016 12:00 AM 1/1/2017 12:00 AM Start and end dates based on timer tags.
2015 4/16/2015 12:00 AM 12/30/2015 12:00 AM Start and end dates based on timer tags.

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  10/4/2022
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

Photos


Event Log Summary

Event Date Event Type Comments
12/1/2022 9:10:00 AM SiteDown

MC 50 has been powered off due to cable damage received from recent high flows. 

10/4/2022 4:00:00 PM SiteUp

Site operational as of 10/04/2022 @ 1600PST.

11/30/2018 3:43:00 PM SiteDown Flooding badly damaged site, beyond immediate repair. Plans to repair site in spring/summer of 2021.
10/16/2016 12:00:00 PM General High noise today, full system
9/1/2016 12:00:00 PM General High noise today, full system
8/29/2016 12:00:00 PM SiteUp System operational
8/26/2016 12:00:00 AM SiteDown System down
7/17/2016 12:00:00 PM General Antenna 3 operational, noise reduced on 2 and 4
7/12/2016 12:00:00 PM General Antenna 3 down and high noise on 2 and 4
3/14/2016 12:00:00 PM General Antenna 3 operational and noise reduced on 2 and 4
3/8/2016 12:00:00 PM General Antenna 2 and 4 back on line with some noise but antenna 3 still down
3/5/2016 12:00:00 PM General Antenna 2-4 down
2/27/2016 12:00:00 PM General Antenna #3 down and high interference on 2 and 4.
2/13/2016 12:00:00 PM General High noise on antenna #4 from 2/4/2016 to 2/12/2016, and completely down on 12/12/2016. Antenna #4 back up and fully operational today.
1/19/2016 6:40:00 PM SiteUp Site Up. Communication restored for Antennas 1-4. Fully Functional Site.
12/29/2015 3:00:00 AM SiteDown Site Down. Master Controller won't power-up. Will assess damage on site visit week of 1/4/2016. Likely cause is severed canbus cable causing short (therefore MC is automatically disabled). Short in canbus cable likely due to damage sustained by 4 ft diameter log that removed two pier ACN's (for LD4), and severed cable. Log still wedged on spillway, and can't be removed by adjusting gates. City of Albany will have to manually remove log when flows subside.
10/27/2015 12:00:00 PM General System down today only
10/22/2015 12:00:00 PM General Antenna #4 down today only
10/21/2015 12:00:00 PM SiteUp System back in operation
10/15/2015 2:34:00 PM General Intermittent operation of antenna 4 on small weir outlet. Suspect bad CANBUS connection. Will fix on next outing.
10/6/2015 12:00:00 PM General High noise today, system wide
9/23/2015 12:00:00 PM SiteUp System operational
8/26/2015 12:00:00 PM SiteDown System down
7/30/2015 10:43:00 AM General Registered new site LD2 in PTAGIS.

No Archived Event Logs