Interrogation Site Metadata
LRU - Lochsa River Upper Site
Status: Active - OperationalGeneral Operational Period: Year Round
Start Date: 12/5/2017 12:00 AM
Site is located in lower 3km of the mainstem Lochsa River. Site is comprised of eighteen 20ft. antennas with the electronic enclosure located on river right. The site consists of a single array of antennas and is channel spanning. The site contains two IS1001-MC units. The left unit controls antennas 1-9 (A1-A9) and the right unit controls antennas 10-18 (B1-B9).
Current Operations
Last File Loaded: | LRU-2024-087-P-005.json |
Date Last File Loaded: | 3/28/2024 3:05 AM |
Date Last File Opened: | 3/27/2024 8:13 PM |
Date Last File Closed: | 3/27/2024 11:17 PM |
Last Observation Tag: | 3DD.0077BCE935 |
Last Observation Date: | 3/26/2024 7:27 PM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2024 | |||
2023 | 1/1/2023 12:00 AM | 1/1/2024 12:00 AM | Start and end dates based on timer tags. |
2022 | 1/1/2022 12:00 AM | 1/1/2023 12:00 AM | Start and end dates based on timer tags. |
2021 | 1/1/2021 12:00 AM | 1/1/2022 12:00 AM | Start and end dates based on timer tags. |
2020 | 1/1/2020 12:00 AM | 1/1/2021 12:00 AM | Start and end dates based on timer tags. See event logs for additional operational information. |
2019 | 1/1/2019 12:00 AM | 12/31/2019 12:00 AM | Start and end dates based on timer tags. |
2018 | 1/1/2018 12:00 AM | 1/1/2019 12:00 AM | Start and end dates based on timer tags. |
2017 | 12/5/2017 12:00 AM | 1/1/2018 12:00 AM | Start and end dates based on timer tags. |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
Instream Array | A0 | A1 |
Instream Array | A0 | A2 |
Instream Array | A0 | A3 |
Instream Array | A0 | A4 |
Instream Array | A0 | A5 |
Instream Array | A0 | A6 |
Instream Array | A0 | A7 |
Instream Array | A0 | A8 |
Instream Array | A0 | A9 |
Instream Array | B0 | B1 |
Instream Array | B0 | B2 |
Instream Array | B0 | B3 |
Instream Array | B0 | B4 |
Instream Array | B0 | B5 |
Instream Array | B0 | B6 |
Instream Array | B0 | B7 |
Instream Array | B0 | B8 |
Instream Array | B0 | B9 |
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
Photos
Event Log Summary
Event Date | Event Type | Comments |
---|---|---|
8/3/2023 12:00:00 AM | SiteUp |
Antenna A5 lost current on June 27, 2023. A5 Node (IS1000 reader) was replaced on August 3, 2023. LRU is operating continuously without disruption through August 8, 2023. |
6/16/2023 6:30:00 PM | SiteUp |
Upper Lochsa (LRU) received 4 new 115A/HR batteries June 16, 2023. Both battery banks began to lose operating voltage thresholds intermittently June 13- through June 16, 2023. |
9/13/2022 12:00:00 AM | SiteUp |
Antenna node A0 06 lost current August 17, 2022 and was replaced September 13, 2022. |
8/22/2022 12:00:00 AM | SiteUp |
Zip ties were added where needed for loose antenna cables. LRU is operating continuously without disruption through August 22, 2022. |
9/22/2021 12:00:00 AM | GMC |
LRU is operating continuously without disruption through November 2, 2021. |
8/18/2020 2:34:00 PM | General | Uppler Lochsa (LRU) PIT array antenna node 04 on Master Controller A0 was replaced on August 18, 2020. LRU is operating continuously without disruption through September 21, 2020. |
6/9/2020 6:28:00 AM | General | Satellite SIM Card Swap and site maintenance. Brush removal from around antenna. |