Interrogation Site Metadata
LSC - Little Sheep Cr Seasonal IPTDS
Status: Active - OperationalGeneral Operational Period: Seasonally
Start Date: 3/7/2023 12:00 AM
The installation of the Little Sheep Cr Seasonal IPTDS will aid in determining where the adult hatchery steelhead spawn in the Imnaha River subbasin. Array will be operational for 3 adult steelhead spawning seasons.
Current Operations
Last File Loaded: | LSC-2024-101-P-001.json |
Date Last File Loaded: | 4/17/2024 10:21 AM |
Date Last File Opened: | 4/10/2024 9:32 AM |
Date Last File Closed: | 4/16/2024 3:47 PM |
Last Observation Tag: | 3DD.003DEB2588 |
Last Observation Date: | 4/16/2024 3:47 PM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2024 | |||
2023 | 3/7/2023 12:00 AM | 6/22/2023 12:00 AM | Start and end dates based on timer tags. |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
Upstream Array | D0 | D1 |
Upstream Array | D0 | D2 |
Downstream Array | D0 | D3 |
Downstream Array | D0 | D4 |
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
No Photos
Event Log Summary
Event Date | Event Type | Comments |
---|---|---|
2/6/2024 12:30:00 PM | SiteUp |
The site is up and running for the season. |
1/24/2024 12:00:00 PM | General |
Antenna 02 was replaced with a 10 ft. Biomark PVC Lite antenna. |
6/21/2023 1:00:00 PM | SiteDown |
LSC array is shut down for the adult steelhead season at 13:00. |
4/14/2023 10:30:00 AM | General |
LSC antenna 2 lost current April 14, 2023 during a highwater event. Repairs to be made after spring run-off. |
3/7/2023 12:00:00 AM | SiteUp |
Little Sheep Creek array started data collection March 7, 2023. One 2 hr. block of no data collection afternoon of March 13, 2023. LSC is operating continuously without disruption through March 27, 2023. |