Interrogation Site Metadata
MEW - Early Winters Acclimation Pond
Status: Active - Non-OperationalGeneral Operational Period: Seasonally
Start Date: 5/3/2019 12:00 AM
Two kidney bean shaped ponds were designed and constructed from 2017 thru 2018 on the Freestone Inn at Wilson Ranch and adjacent to Early Winters Creek and 30 meters south of HWY 20 in Mazama, WA. The antennas are located at the outlet structures of both ponds and in Early Winters Creek at the outlet pipe. Outlet pipes from both ponds join in a common gallery before flowing back into Early Winters Creek. Acclimation of juvenile salmon at this site will occur on a yearly basis. One antenna will be used at the outlet of each pond that has PIT tags. Two antennas will be used in Early Winters Creek where the outlet pipe is located, dependant on creek flow. The interrogation systems are intended to monitor in-pond and smolt to adult survival. The antennas will be operational during release. Typical times of operation for this site will be March 15 thru June 1.
Current Operations
Last File Loaded: | MEW-2022-115-P-001.json |
Date Last File Loaded: | 6/7/2022 3:31 PM |
Date Last File Opened: | 4/25/2022 12:42 PM |
Date Last File Closed: | 5/16/2022 3:54 AM |
Last Observation Tag: | 3DD.003D86F893 |
Last Observation Date: | 5/16/2022 4:54 AM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2023 | |||
2022 | 4/25/2022 1:42 PM | 5/16/2022 4:54 AM | Start and end dates based on file open and closed dates. |
2021 | 4/28/2021 12:00 PM | 5/11/2021 1:00 PM | Start and end dates based on file open and closed dates. |
2020 | 4/25/2020 12:00 AM | 5/14/2020 12:00 AM | Start and end dates based on timer tags. See event logs for additional operational information. |
2019 | 5/3/2019 12:00 AM | 5/15/2019 12:00 AM | Start and end dates based on timer tags. |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
Pond 1 Outlet | A1 | A1 |
Pond 2 Outlet | B1 | B1 |
Outlet to Creek | C1 | C1 |
Outlet to Creek | C2 | C2 |
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
No Photos
Event Log Summary
Event Date | Event Type | Comments |
---|---|---|
6/13/2022 4:00:00 PM | General |
Interrogation event log for the Early Winters Pond Acclimation Ponds (MEW) - 2022 Release During the 2022 acclimation season, Pond 2 contained PIT-tagged hatchery Coho, and Pond 1 contained non-PIT-tagged hatchery Coho. The outlet pipes from both ponds join in a common gallery before flowing into Early Winters Creek. PIT tag interrogation system (Antenna C1) for Early Winters Pond 2 began on 04-25-2022 at 1340 hrs. Antenna (C1) was located in Early Winters Creek at the joint outlet pipe. The last download for this antenna occurred on 05-16-2022 at 0500 hrs. PIT tag interrogation system (Antenna C2) for Early Winters Pond 2 began on 04-25-2022 at 1340 hrs. Antenna (C2) was located 2 meters downstream of antenna (C1) in Early Winters Creek. The last download for this antenna occurred on 05-13-2022 at 1700 hrs. Early Winters Acclimation Pond was de-watered following a visual survey that the pond was devoid of all hatchery Coho on 05-16-2022. Antenna (C1) and Antenna (C2) downloads were combined into a single interrogation file. |
7/14/2021 10:58:00 AM | General |
Interrogation event log for the Early Winters Pond Acclimation Ponds (MEW)-2021 release PIT tag interrogation system (Antenna A1) for the Early Winters Pond 1 began on 04-28-2021 at 1330 hrs. Antenna (A1) was located at the outlet of Pond 1. Antenna (A1) was never moved. Antenna (A1) did experience a lapse in coverage due to a bad card on 04-28-2021 at 1530 hrs until replaced on 04-29-2021 at 1800 hrs. A total of 6 files were downloaded throughout the interrogation period and were incorporated into a single file. The last download for this antenna occurred on 05-11-2021 at 1300 hrs. PIT tag interrogation system (Antenna C1) for the Early Winters Pond 1, began on 04-28-2021 at 1300 hrs. Antenna (C1) was located approximately 25 meters downstream of Antenna (A1) and in Early Winters Creek. Antenna (C1) experienced two lapses in coverage. The first lapse in coverage occurred on 04-30-2021 at 0130 hrs until downloaded on 05-04-2021 at 1430 hrs. The second lapse in coverage occurred on 05-06-2021 at 1500hrs until downloaded on 05-10-2021 at 1314 hrs. A total of 6 files were downloaded throughout the interrogation period and were incorporated into a single file. The last download for this antenna occurred on 05-11-2021 at 1300 hrs. Both antennas were pulled on 05-11-2021 at approximately 1400hrs following a visual survey that the pond was devoid of all hatchery coho. Hatchery juvenile coho were not marked with PIT tags in Pond 2 for the 2021 acclimation season. |
6/30/2020 1:18:07 PM | SiteDown | Interrogation event log for the Early Winters Pond Acclimation Ponds (MEW)-2020 release PIT tag interrogation system (Antenna A1) for the Early Winters Pond 2 began on 04-24-2020 at 1200hrs. Antenna (A1) was located at the outlet of Pond 1. Antenna (A1) was never moved and did not experience any lapse in coverage. A total of 7 files were downloaded throughout the interrogation period and were incorporated into a single file. The last download for this antenna occurred on 05-12-2020 at 1600 hrs. PIT tag interrogation system (Antenna B1) for the Early Winters Ponds began on 04-24-2020 at 1200 hrs. Antenna (B1) was located at the outlet of Pond 2. Antenna (B1) was never moved and did not experience any lapse in coverage. A total of 7 files were downloaded throughout the interrogation period and were incorporated into a single file. The last download for this antenna occurred on 05-12-2020 at 1600 hrs. PIT tag interrogation system (Antenna C1) for the Early Winters Ponds, began on 04-24-2020 at 1200 hrs. Antenna (C1) was located approximately 25 meters downstream of Antenna (B1) and in Early Winters Creek. Antenna (C1) was never moved and did not experience any lapse in coverage. A total of 20 files were downloaded throughout the interrogation period and were incorporated into a single file. The last download for this antenna occurred on 05-13-2020 at 1000 hrs. PIT tag interrogation system (Antenna C2) for the Early Winters Ponds, began interrogation on 04-24-2020 at 1200 hrs. Antenna (C2) was located approximately 1.5 meters downstream of antenna (C1) in Early Winters Creek. Antenna (C2) was never moved and did not experience a lapse of coverage. A total of 20 files were downloaded during the release period. The last download for this antenna occurred on 05-13-2020 at 1000 hrs. All antennas were pulled on 05-13-2020 at approximately 1000hrs following a visual survey that the pond was devoid of all hatchery Coho. |
7/29/2019 10:09:37 AM | General | Interrogation event log for the Early Winters Pond Acclimation Ponds (MEW)-2019 release PIT tag interrogation system (Antenna B1) for the Early Winters Ponds began on 05-03-2019 at 1900 hrs. Antenna (B1) was located at the outlet of the pond. Antenna (B1) was never moved and did not experience any lapse in coverage. A total of 5 files were downloaded throughout the interrogation period and were incorporated into a single file. The last download for this antenna occurred on 05-15-2019 at 1700 hrs. PIT tag interrogation system (Antenna C1) for the Early Winters Ponds, began on 05-03-2019 at 1200 hrs. Antenna (C1) was located approximately 25 meters downstream of Antenna (B1) and in Early Winters Creek. Antenna (C1) was never moved and did not experience any lapse in coverage. A total of 13 files were downloaded throughout the interrogation period and were incorporated into a single file. The last download for this antenna occurred on 05-15-2019 at 1700 hrs. PIT tag interrogation system (Antenna C2) for the Early Winters Ponds, began interrogation on 05-03-2019 at 1200 hrs. Antenna (C2) was located approximately 1.5 meters downstream of antenna (C1) in Early Winters Creek. Antenna (C2) experienced a partial lapse in coverage on 05-10-2019 and 05-11-2019 due to high noise created from increased flows over the array. A total of 13 files were downloaded during the release period. The last download for this antenna occurred on 05-15-2019 at 1700 hrs. All antennas were pulled on 05-15-2019 at approximately 1800hrs following a visual survey that the pond was devoid of all hatchery Coho. The pond was then de-watered. |