Interrogation Site Metadata
MRC - Methow River at Carlton
Status: Active - Operations UnspecifiedGeneral Operational Period: Year Round
Start Date: 10/28/2015 12:00 AM
This site will be located in the mainstem Methow River near the town of Carlton at river km 45. There will be one row of six 20 foot long antennas spanning the river. They will be anchored in a pass-over configuration. The system will be powered with AC on the adjacent left bank.
Current Operations
Last File Loaded: | MRC-2024-116-P-006.json |
Date Last File Loaded: | 4/26/2024 4:32 AM |
Date Last File Opened: | 4/25/2024 11:47 PM |
Date Last File Closed: | 4/26/2024 2:53 AM |
Last Observation Tag: | 3DD.003E57E053 |
Last Observation Date: | 4/26/2024 2:53 AM |
Detection Summary: | Last Day's Observations |
Contacts
Location
Operational History
Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.
Year | Start Date | End Date | Comments |
---|---|---|---|
2024 | |||
2023 | 1/1/2023 12:00 AM | 1/1/2024 12:00 AM | Start and end dates based on timer tags. |
2022 | 1/1/2022 12:00 AM | 1/1/2023 12:00 AM | Start and end dates based on timer tags. |
2021 | 1/1/2021 12:00 AM | 1/1/2022 12:00 AM | Start and end dates based on timer tags. |
2020 | 1/1/2020 12:00 AM | 1/1/2021 12:00 AM | Start and end dates based on timer tags. See event logs for additional operational information. |
2019 | 1/1/2019 12:00 AM | 12/31/2019 12:00 AM | Start and end dates based on timer tags. |
2018 | 1/1/2018 12:00 AM | 1/1/2019 12:00 AM | Start and end dates based on timer tags. |
2017 | 1/1/2017 12:00 AM | 1/1/2018 12:00 AM | Start and end dates based on timer tags. |
2016 | 1/1/2016 12:00 AM | 1/1/2017 12:00 AM | Start and end dates based on timer tags. |
2015 | 10/28/2015 12:00 AM | 1/1/2016 12:00 AM |
Configuration
Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.
Antenna Group | Transceiver ID | Antenna ID |
---|---|---|
Single Array | 01 | 01 |
Single Array | 01 | 02 |
Single Array | 01 | 03 |
Single Array | 01 | 04 |
Single Array | 01 | 05 |
Single Array | 01 | 06 |
Site Configuration Diagrams:
Equipment History
Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.
Equipment Code | Description | Start Date | End Date |
---|
No Photos
Event Log Summary
Event Date | Event Type | Comments |
---|---|---|
5/24/2018 12:00:00 AM | General | System down from 5/9/18 to 5/24/18; removed onshore equipment due to high water. Antennas 3 and 4 down on 5/24/18 |
5/6/2018 12:00:00 AM | General | Antennas 5 and 6 down |
4/26/2018 12:00:00 AM | General | Antenna 6 down from 4/10/18 to 4/26/18 |
12/12/2017 2:45:00 PM | General | Updated the MC firmware from 1.6.2 to 1.6.3 Updated the CBG firmware from 1.5.1 to 1.6.2 Updated nodes firmware 1, 2, 5, 6 from 1.6.2 to 1.6.3 Nodes 3, 4, were already at 1.6.3 |
10/18/2017 12:00:00 PM | General | Antennas 3, 4, 5, 6 installed; up and running |
6/2/2017 10:00:00 AM | General | Site up |
6/1/2017 12:00:00 AM | General | System down |
5/23/2017 12:00:00 AM | General | Antenna 3 down |
5/11/2017 12:00:00 AM | General | Antenna 5 and 6 down |
5/7/2017 12:00:00 AM | General | Antenna 4 down |
4/10/2017 12:00:00 AM | General | Antenna 1 up - new IS1001 |
3/27/2017 12:00:00 AM | General | Antenna 2 up |
3/10/2017 12:00:00 AM | General | Antenna 5 up and antenna 2 down (IS1001 moved from ant 2 to 5) |
9/30/2016 9:30:00 AM | General | Ant 4 back up. Replaced with ACN from antenna 1. Took antenna 1 out of sequence - antenna 1 is dry - above water line except in high flows. |
9/28/2016 2:00:00 PM | General | Ant 5 and 6 down from 9-22-16 at 11:00 to 9-28-16 at 14:00 |
6/2/2016 12:00:00 AM | General | System back up (1 and 2) |
5/4/2016 10:28:00 AM | General | Antenna 4 down |
12/10/2015 12:00:00 AM | General | Site down from 11/4/15 to 11/11/15 Site down from 11/17/15 to 12/7/15 due to faulty switchboard. 12/7/15 to 12/10/15 - site running for three hours then off for three hours - replaced switchboard fuse. |
10/28/2015 12:00:00 AM | General | MRC site installed and operational |
8/19/2015 11:24:50 AM | General | Registered new interrogation site MRC in PTAGIS. |