Skip to Main Content
PTAGIS logo link back to home page

Interrogation Site Metadata

MRC - Methow River at Carlton

Status:   Active - Operations Unspecified
Site Type: Instream Remote Detection System  |  Organization: Washington Dept. of Fish and Wildlife
General Operational Period: Year Round
Start Date: 10/28/2015 12:00 AM

This site will be located in the mainstem Methow River near the town of Carlton at river km 45. There will be one row of six 20 foot long antennas spanning the river. They will be anchored in a pass-over configuration. The system will be powered with AC on the adjacent left bank.

Current Operations

Last File Loaded: MRC-2024-116-P-006.json
Date Last File Loaded: 4/26/2024 4:32 AM
Date Last File Opened: 4/25/2024 11:47 PM
Date Last File Closed: 4/26/2024 2:53 AM
Last Observation Tag: 3DD.003E57E053
Last Observation Date: 4/26/2024 2:53 AM
Detection Summary: Last Day's Observations

Contacts

Primary Contact:

David Grundy
david.grundy@dfw.wa.gov
509-997-0048

Data Steward:

Matthew Stilwater
matthew.stilwater@dfw.wa.gov
509-664-3148

Location

Coordinates: 48.246996, -120.118464  |  River Km: 843.045

Operational History

Operational history describes the period the site was interrogating for PIT tags. The comments provide anecdotal information about the operation of the site during this period. Site operational periods are updated typically at the end of the calendar year.

Year Start Date End Date Comments
2024
2023 1/1/2023 12:00 AM 1/1/2024 12:00 AM Start and end dates based on timer tags.
2022 1/1/2022 12:00 AM 1/1/2023 12:00 AM Start and end dates based on timer tags.
2021 1/1/2021 12:00 AM 1/1/2022 12:00 AM Start and end dates based on timer tags.
2020 1/1/2020 12:00 AM 1/1/2021 12:00 AM Start and end dates based on timer tags. See event logs for additional operational information.
2019 1/1/2019 12:00 AM 12/31/2019 12:00 AM Start and end dates based on timer tags.
2018 1/1/2018 12:00 AM 1/1/2019 12:00 AM Start and end dates based on timer tags.
2017 1/1/2017 12:00 AM 1/1/2018 12:00 AM Start and end dates based on timer tags.
2016 1/1/2016 12:00 AM 1/1/2017 12:00 AM Start and end dates based on timer tags.
2015 10/28/2015 12:00 AM 1/1/2016 12:00 AM

Configuration

Configuration metadata includes details about the equipment used at the site to detect and record PIT tags. A new configuration sequence record is created when equipment is added or removed from the site and the period of time it was active. A configuration sequence without an End Date is currently active.

Select Configuration Number:
Start Date:  9/21/2015
End Date:  ----

Site Configuration Diagrams:

Equipment History

Select a type to view the history of equipment installed at this site. A missing End Date implies the information about the equipment is current.

Select Equipment Type:
Equipment Code Description Start Date End Date

No Photos

Event Log Summary

Event Date Event Type Comments
5/24/2018 12:00:00 AM General System down from 5/9/18 to 5/24/18; removed onshore equipment due to high water. Antennas 3 and 4 down on 5/24/18
5/6/2018 12:00:00 AM General Antennas 5 and 6 down
4/26/2018 12:00:00 AM General Antenna 6 down from 4/10/18 to 4/26/18
12/12/2017 2:45:00 PM General Updated the MC firmware from 1.6.2 to 1.6.3 Updated the CBG firmware from 1.5.1 to 1.6.2 Updated nodes firmware 1, 2, 5, 6 from 1.6.2 to 1.6.3 Nodes 3, 4, were already at 1.6.3
10/18/2017 12:00:00 PM General Antennas 3, 4, 5, 6 installed; up and running
6/2/2017 10:00:00 AM General Site up
6/1/2017 12:00:00 AM General System down
5/23/2017 12:00:00 AM General Antenna 3 down
5/11/2017 12:00:00 AM General Antenna 5 and 6 down
5/7/2017 12:00:00 AM General Antenna 4 down
4/10/2017 12:00:00 AM General Antenna 1 up - new IS1001
3/27/2017 12:00:00 AM General Antenna 2 up
3/10/2017 12:00:00 AM General Antenna 5 up and antenna 2 down (IS1001 moved from ant 2 to 5)
9/30/2016 9:30:00 AM General Ant 4 back up. Replaced with ACN from antenna 1. Took antenna 1 out of sequence - antenna 1 is dry - above water line except in high flows.
9/28/2016 2:00:00 PM General Ant 5 and 6 down from 9-22-16 at 11:00 to 9-28-16 at 14:00
6/2/2016 12:00:00 AM General System back up (1 and 2)
5/4/2016 10:28:00 AM General Antenna 4 down
12/10/2015 12:00:00 AM General Site down from 11/4/15 to 11/11/15 Site down from 11/17/15 to 12/7/15 due to faulty switchboard. 12/7/15 to 12/10/15 - site running for three hours then off for three hours - replaced switchboard fuse.
10/28/2015 12:00:00 AM General MRC site installed and operational
8/19/2015 11:24:50 AM General Registered new interrogation site MRC in PTAGIS.

No Archived Event Logs